A collaborative scheduling model for production and transportation of ready-mixed concrete

被引:2
|
作者
Yin, Jing [1 ]
Huang, Ran [1 ]
Sun, Hao [1 ]
Lin, Taosheng [1 ]
机构
[1] Beijing Univ Civil Engn & Architecture, Sch Mech Elect & Vehicle Engn, Dept Ind Engn, Beijing 100044, Peoples R China
关键词
ready-mixed concrete; production and transportation; genetic algorithm; GENETIC ALGORITHMS; TRUCKS;
D O I
10.3934/mbe.2023320
中图分类号
Q [生物科学];
学科分类号
07 ; 0710 ; 09 ;
摘要
Ready-mixed-concrete (RMC) is an important green and clean building material which is widely used in modern civil engineering. For the large-scale planar foundations of urban public buildings, huge amounts of RMC need to be continuously delivered to the construction site according to strict time windows, which brings the problem of multi-plants collaborative supply. In this paper, considering transportation capacity, initial setting time, and interrupt pumping time, a collaborative scheduling model for production and transportation of RMC with the objective of minimizing the penalty cost of interruption pumping and vehicle waiting time and fuel consumption cost was established. According to the characteristics of the problem, a double chromosome synchronous evolution genetic algorithm was designed. Finally, the model and algorithm proposed in the paper were verified by data experiments. The computing results showed that in two cases of different scenarios, such as ordinary constructions and emergency constructions, the proposed scheduling model can save 18.6 and 24.8% cost respectively. The scheduling model and algorithm proposed in the paper can be applied directly to improve the operational efficiency of RMC supply chain.
引用
收藏
页码:7387 / 7406
页数:20
相关论文
共 50 条
  • [1] Integrated scheduling of ready-mixed concrete production and delivery
    Liu, Zhenyuan
    Zhang, Yang
    Li, Menglei
    AUTOMATION IN CONSTRUCTION, 2014, 48 : 31 - 43
  • [2] READY-MIXED CONCRETE PRODUCTION
    STILLWEL.JA
    CONCRETE, 1974, 8 (01): : 25 - 25
  • [3] APPLICATION OF PRODUCTION SCHEDULING TECHNIQUES FOR DISPATCHING READY-MIXED CONCRETE
    Thawongklang, Kittipong
    Tanwanichkul, Ladda
    INTERNATIONAL JOURNAL OF TECHNOLOGY, 2016, 7 (07) : 1163 - 1170
  • [4] Ready-mixed Concrete Production 2016
    Schacht, G.
    Bolle, G.
    Curbach, M.
    Marx, S.
    BETON- UND STAHLBETONBAU, 2016, 111 (06) : 354 - 354
  • [5] Modelling and optimising of ready-mixed concrete vehicle scheduling problem with stochastic transportation time
    Zhang G.-C.
    Zeng J.-C.
    Zhang J.-H.
    International Journal of Wireless and Mobile Computing, 2016, 10 (02) : 104 - 111
  • [6] A grey production planning model on a ready-mixed concrete plant
    Aydemir, Erdal
    Yilmaz, Gokhan
    Oruc, Kenan Oguzhan
    ENGINEERING OPTIMIZATION, 2020, 52 (05) : 817 - 831
  • [7] Personnel scheduling problem for ready-mixed concrete delivery
    Aziez, Imadeddine
    Cote, Jean-Francois
    Coelho, Leandro C.
    EXPERT SYSTEMS WITH APPLICATIONS, 2025, 266
  • [8] READY-MIXED CONCRETE
    不详
    CONCRETE, 1967, 1 (07): : 215 - &
  • [9] READY-MIXED CONCRETE
    不详
    CONCRETE, 1967, 1 (05): : 166 - &
  • [10] Ready-Mixed Concrete Industry to increase Production
    不详
    BETON- UND STAHLBETONBAU, 2011, 106 (10) : 684 - 684