摘要
Electricity is crucial for daily life due to the number of activities that depend on it. To forecast future electric load, which changes over time and depends on various factors, grid operators (GOs) must create forecasting models for various time horizons with a high degree of accuracy because the results have a huge impact on their decision-making regarding, for example, the scheduling of power units to supply user consumption in the short or long term or the installation of new power plants. This has led to the exploration of multiple techniques like statistical models and Artificial Intelligence (AI), with Machine-Learning and Deep-Learning algorithms being the most popular in this latter field. This paper proposes a neural network-based model to forecast short-term load for a Colombian grid operator, considering a seven-day time horizon and using an LSTM recurrent neural network with historical load values from a region in Colombia and calendar features such as holidays and the current month corresponding to the target week. Unlike other LSTM implementations found in the literature, in this work, the LSTM cells read multiple load measurements at once, and the additional information (holidays and current month) is concatenated to the output of the LSTM. The result is used to feed a fully connected neural network to obtain the desired forecast. Due to social problems in the country, the load data presents a strange behavior, which, in principle, affects the prediction capacity of the model. Still, it is eventually able to adjust its forecasts accordingly. The regression metric MAPE measures the model performance, with the best predicted week having an error of 1.65% and the worst week having an error of 26.22%. Additionally, prediction intervals are estimated using bootstrapping.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Short-Term Load Forecasting Using an LSTM Neural Network
    Hossain, Mohammad Safayet
    Mahmood, Hisham
    [J]. 2020 IEEE POWER AND ENERGY CONFERENCE AT ILLINOIS (PECI), 2020,
  • [2] A Novel Hybrid Short-Term Load Forecasting Method of Smart Grid Using MLR and LSTM Neural Network
    Li, Jian
    Deng, Daiyu
    Zhao, Junbo
    Cai, Dongsheng
    Hu, Weihao
    Zhang, Man
    Huang, Qi
    [J]. IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2021, 17 (04) : 2443 - 2452
  • [3] Short-Term Residential Load Forecasting Based on LSTM Recurrent Neural Network
    Kong, Weicong
    Dong, Zhao Yang
    Jia, Youwei
    Hill, David J.
    Xu, Yan
    Zhang, Yuan
    [J]. IEEE TRANSACTIONS ON SMART GRID, 2019, 10 (01) : 841 - 851
  • [4] Short-term load forecasting based on MB-LSTM neural network
    Cai, Changchun
    Tao, Yuan
    Ren, Qiwen
    Hu, Gang
    [J]. 2020 CHINESE AUTOMATION CONGRESS (CAC 2020), 2020, : 5402 - 5406
  • [5] Short-Term Load Forecasting in Power System Using CNN-LSTM Neural Network
    Truong Hoang Bao Huy
    Dieu Ngoc Vo
    Khai Phuc Nguyen
    Viet Quoc Huynh
    Minh Quang Huynh
    Khoa Hoang Truong
    [J]. 2023 ASIA MEETING ON ENVIRONMENT AND ELECTRICAL ENGINEERING, EEE-AM, 2023,
  • [6] Short-Term Photovoltaic Power Forecasting Using an LSTM Neural Network
    Hossain, Mohammad Safayet
    Mahmood, Hisham
    [J]. 2020 IEEE POWER & ENERGY SOCIETY INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE (ISGT), 2020,
  • [7] Short-Term Load Forecasting Using Artificial Neural Network
    Buhari, Muhammad
    Adamu, Sanusi Sani
    [J]. INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, IMECS 2012, VOL I, 2012, : 83 - 88
  • [8] Short-Term Load Forecasting Using Hybrid Neural Network
    Nadeem, Muhammad
    Altaf, Muhammad
    Ahmad, Ayaz
    [J]. INTERNATIONAL JOURNAL OF APPLIED METAHEURISTIC COMPUTING, 2021, 12 (01) : 142 - 156
  • [9] Short-term load forecasting using Fuzzy Neural Network
    Shao, S
    Sun, YM
    [J]. FOURTH INTERNATIONAL CONFERENCE ON ADVANCES IN POWER SYSTEM CONTROL, OPERATION & MANAGEMENT, VOLS 1 AND 2, 1997, : 131 - 134
  • [10] SHORT-TERM LOAD FORECASTING USING AN ARTIFICIAL NEURAL NETWORK
    LEE, KY
    CHA, YT
    PARK, JH
    KURZYN, MS
    PARK, DC
    MOHAMMED, OA
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (01) : 124 - 132