Improving robustness of case-based reasoning for early-stage construction cost estimation

被引:5
|
作者
Xiao, Xue [1 ,5 ]
Skitmore, Martin [2 ]
Yao, Weixin [3 ]
Ali, Yousuf [4 ]
机构
[1] Queensland Univ Technol, Sci & Engn Fac, Brisbane, Australia
[2] Queensland Univ Technol, QUT Queensland Univ Technol, Brisbane, Australia
[3] Univ California, Brisbane, Australia
[4] Queensland Univ Technol, Gardens Point Campus, Brisbane, Australia
[5] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Peoples R China
关键词
Robustness; Case-based reasoning; Early construction cost estimation; MODLR regression; Long-term use; ESTIMATING MODEL; NEURAL-NETWORKS; PREDICTION; SYSTEM; KNOWLEDGE; PROJECT; DESIGN;
D O I
10.1016/j.autcon.2023.104777
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the long-term use of the Case-based reasoning (CBR) model for early-stage construction cost estimation, a typical issue is the unstable knowledge structure when the actual data distribution does not satisfy the assumed distribution. This study combines Modal Linear Regression (MODLR) with CBR, for comparison with the con-ventional CBR models using genetic algorithm (GA) and ordinary least squares (OLS), tested by simulated data and a case study of 1610 apartment buildings. The results show the variance of attribute weight in MODLR-CBR is far less than others, validating its superior knowledge stability in dealing with changes in the case-base. This study not only bridges the gap in the robustness of CBR models, but also prepares construction cost practitioners tackle the massive growth in the volume of the cost data. The results can be further referenced to the area of multidimensional optimization in CBR.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] The Case-Based Reasoning Model Of Cost Estimation At The Preliminary Stage Of A Construction Project
    Zima, Krzysztof
    [J]. INNOVATIVE SOLUTIONS IN CONSTRUCTION ENGINEERING AND MANAGEMENT: FLEXIBLE APPROACH, 2015, 122 : 57 - 64
  • [2] Improving Accuracy of Early Stage Cost Estimation by Revising Categorical Variables in a Case-Based Reasoning Model
    Jin, RunZhi
    Han, Sangwon
    Hyun, ChangTaek
    Kim, JiHoon
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (07)
  • [3] Case Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea
    Ji, Sae-Hyun
    Park, Moonseo
    Lee, Hyun-Soo
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2012, 138 (01): : 43 - 52
  • [4] The application of case-based reasoning to early web project cost estimation
    Mendes, E
    Mosley, N
    Counsell, S
    [J]. 26TH ANNUAL INTERNATIONAL COMPUTER SOFTWARE AND APPLICATIONS CONFERENCE, PROCEEDINGS, 2002, : 393 - 398
  • [5] Improved similarity measure in case-based reasoning: a case study of construction cost estimation
    Hyung, Won-Gil
    Kim, Sangyong
    Jo, Jung-Kyu
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (02) : 561 - 578
  • [6] Interval Estimation of Construction Cost Using Case-Based Reasoning and Genetic Algorithms
    Kim, Sangyong
    [J]. JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2012, 11 (02) : 327 - 334
  • [7] Covariance effect analysis of similarity measurement methods for early construction cost estimation using case-based reasoning
    Ahn, Joseph
    Park, Moonseo
    Lee, Hyun-Soo
    Ahn, Sung Jin
    Ji, Sae-Hyun
    Song, Kwonsik
    Son, Bo-Sik
    [J]. AUTOMATION IN CONSTRUCTION, 2017, 81 : 254 - 266
  • [8] Compensation Cost Estimation Model for Construction Noise Claims Using Case-Based Reasoning
    Kwon, Nahyun
    Cho, Jongwoo
    Lee, Hyun-Soo
    Yoon, Inseok
    Park, Moonseo
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (08)
  • [9] Combining case-based reasoning with genetic algorithm optimization for preliminary cost estimation in construction industry
    Kim, Sangyong
    Shim, Jae Heon
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2014, 41 (01) : 65 - 73
  • [10] A simple formulation for early-stage cost estimation of building construction projects
    Dobrucali, Esra
    Demir, Ismail Hakki
    [J]. GRADEVINAR, 2021, 73 (08): : 819 - 832