The different units' performance and bed length effect of constructed wetland on the removal of organic substances, solids and nutrients from municipal wastewater: a case study, Iran

被引:0
|
作者
Davoodi, Reza [1 ]
Sharafi, Kiomars [2 ]
Soleimani, Hamed [1 ]
Mahvi, Amir Hossein [1 ,3 ]
机构
[1] Univ Tehran Med Sci, Sch Publ Hlth, Dept Environm Hlth Engn, Tehran, Iran
[2] Kermanshah Univ Med Sci, Res Ctr Environm Determinants Hlth RCEDH, Kermanshah, Iran
[3] Univ Tehran Med Sci, Inst Environm Res IER, Ctr Solid Waste Res CSWR, Tehran, Iran
关键词
Constructed wetland; Municipal wastewater; Reed bed; Wastewater pollutants; Qasr-e-Shirin; STABILIZATION POND; PILOT; EFFLUENT;
D O I
10.5004/dwt.2023.29158
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This study investigated the overall performance and bed length effect of the horizontal subsurface flow constructed wetland (CW) process for full-scale municipal wastewater treatment. 168 sam-ples were collected, including 84 samples in the hot and 84 in the cold season. Seven sampling points were selected as follows: (1) inlet raw wastewater, (2) effluent from an anaerobic pond, (3) from the first 5 m of the selected reed bed, (4) 5 m second, (5) 5 m third, (6) 5 m fourth, and (7) 5 m fifth from the reed bed. The evaluation parameters included biochemical oxygen demand (BOD5), chemical oxygen demand (COD), total suspended solids (TSS), total nitrogen (TN), and total phosphorus (TP). The results showed that the removal efficiency for the BOD5 , COD, TSS, TN, and TP was equal to 90.6%, 90.1%, 94%, 50.2%, and 35.4%, respectively. In the final treated effluent, the concentration of all studied parameters was less than the maximum allowable amount for discharge to the receiving water. The results showed that although the treatment plant's pol-lution load for BOD5 and COD parameters in winter was significantly higher than in summer, the treatment plant efficiency in winter was not significantly different from summer. The results also showed that a 15-m bed in the CW system is suitable for achieving the standard of the environ-mental protection organization of Iran for municipal wastewater treatment in the hot season; how-ever, it seems not to be enough in the cold season. So, 25 m of reed bed length will be required in practice. Finally, it can be concluded that the Qasr-e-Shirin wastewater treatment plant has the proper capability to remove municipal wastewater pollutants in different temperature conditions and the quality of the final effluent indicates the accuracy of the design criteria for this system.
引用
收藏
页码:91 / 102
页数:12
相关论文
共 17 条
  • [1] Performance of a constructed wetland in Grand Marais, Manitoba, Canada: Removal of nutrients, pharmaceuticals, and antibiotic resistance genes from municipal wastewater
    Julie C Anderson
    Jules C Carlson
    Jennifer E Low
    Jonathan K Challis
    Charles S Wong
    Charles W Knapp
    Mark L Hanson
    Chemistry Central Journal, 7
  • [2] Performance of a constructed wetland in Grand Marais, Manitoba, Canada: Removal of nutrients, pharmaceuticals, and antibiotic resistance genes from municipal wastewater
    Anderson, Julie C.
    Carlson, Jules C.
    Low, Jennifer E.
    Challis, Jonathan K.
    Wong, Charles S.
    Knapp, Charles W.
    Hanson, Mark L.
    CHEMISTRY CENTRAL JOURNAL, 2013, 7
  • [3] Removal efficiency of organic substances in effluent from a municipal sewage plant by a subsurface constructed wetland
    Yang, Changming
    Ma, Rui
    Wang, Mengmeng
    Li, Jianhua
    Tongji Daxue Xuebao/Journal of Tongji University, 2012, 40 (08): : 1210 - 1216
  • [4] Fluctuation of organic substances, solids, protozoan cysts, and parasite egg at different units of a wastewater integrated stabilization pond (full scale treatment plant): a case study, Iran
    Sharafi, K.
    Pirsaheb, M.
    Khosravi, T.
    Dargahi, A.
    Moradi, M.
    Savadpour, M. T.
    DESALINATION AND WATER TREATMENT, 2016, 57 (11) : 4913 - 4919
  • [5] Sequential Hybrid Constructed Wetland for Effective Nutrient Removal from Municipal Wastewater Treatment Plant Effluent: A Full Scale Case Study
    Zhu, Liying
    Liang, Wei
    Wang, Chunrong
    Hamidian, Amir Hossein
    ENVIRONMENTAL ENGINEERING SCIENCE, 2022, 39 (02) : 168 - 177
  • [6] Performance of subsurface flow constructed wetland mesocosms in enhancing nutrient removal from municipal wastewater in warm tropical environments
    Bateganya, Najib Lukooya
    Kazibwe, Alex
    Langergraber, Guenter
    Okot-Okumu, James
    Hein, Thomas
    ENVIRONMENTAL TECHNOLOGY, 2016, 37 (08) : 960 - 974
  • [7] Removal of nutrients from wastewater with Canna indica L. under different vertical-flow constructed wetland conditions
    Cui, Lihua
    Ouyang, Ying
    Lou, Qian
    Yang, Fengle
    Chen, Ying
    Zhu, Wenling
    Luo, Shiming
    ECOLOGICAL ENGINEERING, 2010, 36 (08) : 1083 - 1088
  • [8] Efficiency and kinetic modeling of removal of nutrients and organic matter from a full-scale constructed wetland in Qasr-e-Shirin, Iran
    Gholizadeh, Abdolmajid
    Gholami, Mitra
    Davoudi, Reza
    Rastegar, Ayoob
    Miri, Mohammad
    ENVIRONMENTAL HEALTH ENGINEERING AND MANAGEMENT JOURNAL, 2015, 2 (03): : 107 - 116
  • [9] An Investigation into the Use of Sand Media Planted with Thypa latifolia in Constructed Wetland Ecotechnology in Removing Organic matter, Suspended Solids and Nutrients from Domestic Wastewater
    de Rozari, Philiphi
    Krisnayanti, Denik Sri
    Gaol, Mangadas Lumban
    3RD INTERNATIONAL SEMINAR ON CHEMICAL EDUCATION: TRENDS, APPLICATIONS, CHANGES IN CHEMICAL EDUCATION FOR THE 4.0 INDUSTRIAL REVOLUTION, 2020, 2229
  • [10] PERFORMANCE EVALUATION OF A FULL-SCALE CONSTRUCTED WETLAND SYSTEM PROVIDING SECONDARY AND TERTIARY TREATMENT OF MUNICIPAL WASTEWATER - AN AUSTRALIAN CASE STUDY
    Meney, Kathy
    Pantelic, Ljiljana
    Hardcastle, Kathryn
    TECHNOLOGIES AND MANAGEMENT FOR SUSTAINABLE BIOSYSTEMS, 2009, : 147 - 156