Beam dynamics for beam commissioning of RAON linac and KoBRA beam line

被引:6
|
作者
Jang, Ji-Ho [1 ]
Jeon, Dong-O. [1 ]
Jin, Hyunchang [1 ]
机构
[1] Inst for Basic Sci Korea, Rare Isotope Sci Project, Daejeon, South Korea
基金
新加坡国家研究基金会;
关键词
RAON; Injector; SCL3; KoBRA beam line; Beam dynamics; Beam commissioning;
D O I
10.1007/s40042-023-00761-6
中图分类号
O4 [物理学];
学科分类号
0702 ;
摘要
The beam commissioning of the low-energy part in the RAON (rare-isotope accelerator complex for on-line experiment) facility started from the injector in August 2021. This paper presents beam dynamics studies of argon beams used in the beam commissioning of the injector, the low-energy part of superconducting linac and KoBRA (KOrea Broad acceptance Recoil spectrometer and Apparatus) beam line, and bismuth beams as reference beams of the superconducting linac. The contents are the beam dynamics simulation including beam matching in order to obtain set values of the linac and orbit correction studies for checking the steering scheme.
引用
收藏
页码:1062 / 1077
页数:16
相关论文
共 50 条
  • [1] Beam dynamics for beam commissioning of RAON linac and KoBRA beam line
    Ji-Ho Jang
    Dong-O. Jeon
    Hyunchang Jin
    Journal of the Korean Physical Society, 2023, 82 : 1062 - 1077
  • [2] Beam dynamics for RAON linac and beam lines
    Jang, Ji-Ho
    Jeon, Dong-O
    Jin, Hyunchang
    Kim, Hyung-Jin
    JOURNAL OF THE KOREAN PHYSICAL SOCIETY, 2024,
  • [3] Beam dynamics simulation and beam commissioning preparation in the RAON accelerator
    Jin, H.
    Jang, J.
    Jeon, D.
    JOURNAL OF INSTRUMENTATION, 2020, 15 (12)
  • [4] Beam dynamics study for NDPS beam line of RAON
    Jang, Ji-Ho
    Jeon, Dong-O
    Jin, Hyunchang
    JOURNAL OF THE KOREAN PHYSICAL SOCIETY, 2023, 83 (02) : 108 - 115
  • [5] Beam dynamics study for NDPS beam line of RAON
    Ji-Ho Jang
    Dong-O Jeon
    Hyunchang Jin
    Journal of the Korean Physical Society, 2023, 83 : 108 - 115
  • [6] Error analysis in post linac to driver linac transport beam line of RAON
    Chanmi Kim
    Eun-San Kim
    Journal of the Korean Physical Society, 2016, 69 : 11 - 15
  • [7] Error analysis in post linac to driver linac transport beam line of RAON
    Kim, Chanmi
    Kim, Eun-San
    JOURNAL OF THE KOREAN PHYSICAL SOCIETY, 2016, 69 (01) : 11 - 15
  • [8] Beam dynamics and commissioning of the J-PARC linac
    Kondo, Y
    Ikegami, A
    Kobayashi, T
    Ohkawa, T
    Ueno, A
    HIGH INTENSITY AND HIGH BRIGHTNESS HADRON BEAMS, 2005, 773 : 79 - 83
  • [9] KoBRA and 40Ar9+ beam commissioning
    Lee, Kwang-Bok
    Tshoo, Kyoungho
    Kim, Dong Geon
    Pyeun, Seong Jae
    Kwag, Min Sik
    Akers, Charles
    Kim, Mi Jung
    Kim, Eunhee
    Kim, Jae Cheon
    Son, Changwook
    Ham, Cheolmin
    Kwak, Donghyun
    Lee, Sangjin
    Lee, Cheongsoo
    Oh, Geonhee
    Lim, Chaeyoung
    Shin, Taeksu
    JOURNAL OF THE KOREAN PHYSICAL SOCIETY, 2025,
  • [10] Beam commissioning of BEPCII injector linac
    Chen, Yan-Wei
    Wang, Shu-Hong
    Pei, Guo-Xi
    Liu, Wei-Bin
    Ye, Qiang
    Kao Neng Wu Li Yu Ho Wu Li/High Energy Physics and Nuclear Physics, 2006, 30 (06): : 562 - 565