An improved memetic algorithm to solve the energy-efficient distributed flexible job shop scheduling problem with transportation and start-stop constraints

被引:4
|
作者
Gu, Yifan [1 ]
Xu, Hua [1 ]
Yang, Jinfeng [1 ]
Li, Rui [1 ]
机构
[1] Jiangnan Univ, Sch Artificial Intelligence & Comp Sci, Wuxi 214122, Peoples R China
关键词
multi-objective optimization; memetic algorithm; transportation time; energy-saving strategy; start-stop constraint; GENETIC ALGORITHM; OPTIMIZATION; MAKESPAN;
D O I
10.3934/mbe.2023950
中图分类号
Q [生物科学];
学科分类号
07 ; 0710 ; 09 ;
摘要
In the current global cooperative production environment, modern industries are confronted with intricate production plans, demanding the adoption of contemporary production scheduling strategies. Within this context, distributed manufacturing has emerged as a prominent trend. Manufacturing enterprises, especially those engaged in activities like automotive mold production and welding, are facing a significant challenge in managing a significant amount of small-scale tasks characterized by short processing times. In this situation, it becomes imperative to consider the transportation time of jobs between machines. This paper simultaneously considers the transportation time of jobs between machines and the start-stop operation of the machines, which is the first time to our knowledge. An improved memetic algorithm (IMA) is proposed to solve the multi-objective distributed flexible job shop scheduling problem (MODFJSP) with the goal of minimizing maximum completion time and energy consumption. Then, a new multi-start simulated annealing algorithm is proposed and integrated into the IMA to improve the exploration ability and diversity of the algorithm. Furthermore, a new multiple-initialization rule is designed to enhance the quality of the initial population. Additionally, four improved variable neighborhood search strategies and two energy-saving strategies are designed to enhance the search ability and reduce energy consumption. To verify the effectiveness of the IMA, we conducted extensive testing and comprehensive evaluation on 20 instances. The results indicate that, when faced with the MODFJSP, the IMA can achieve better solutions in almost all instances, which is of great significance for the improvement of production scheduling in intelligent manufacturing.
引用
收藏
页码:21467 / 21498
页数:32
相关论文
共 50 条
  • [1] An Improved Genetic Algorithm Combining Tabu Search for Solving Flexible Job Shop Scheduling Problem with Transportation and Start-Stop Constraints
    Gu, Yifan
    Xu, Hua
    Li, Rui
    Yang, Jinfeng
    ADVANCED INTELLIGENT COMPUTING TECHNOLOGY AND APPLICATIONS, PT II, ICIC 2024, 2024, 14863 : 295 - 307
  • [2] An improved memetic algorithm for the flexible job shop scheduling problem with transportation times
    Zhang, Guohui
    Sun, Jinghe
    Lu, Xixi
    Zhang, Haijun
    MEASUREMENT & CONTROL, 2020, 53 (7-8): : 1518 - 1528
  • [3] An efficient memetic algorithm for distributed flexible job shop scheduling problem with transfers
    Luo, Qiang
    Deng, Qianwang
    Gong, Guiliang
    Zhang, Like
    Han, Wenwu
    Li, Kexin
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 160
  • [4] A reinforcement learning based memetic algorithm for energy-efficient distributed two-stage flexible job shop scheduling problem
    Geng, Kaifeng
    Liu, Li
    Wu, Shaoxing
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [5] Hybrid Memetic Algorithm to Solve Multiobjective Distributed Fuzzy Flexible Job Shop Scheduling Problem with Transfer
    Yang, Jinfeng
    Xu, Hua
    PROCESSES, 2022, 10 (08)
  • [6] Multi-objective optimization for energy-efficient flexible job shop scheduling problem with transportation constraints
    Dai Min
    Tang Dunbing
    Adriana, Giret
    Salido Miguel, A.
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2019, 59 : 143 - 157
  • [7] Surprisingly Popular-Based Adaptive Memetic Algorithm for Energy-Efficient Distributed Flexible Job Shop Scheduling
    Li, Rui
    Gong, Wenyin
    Wang, Ling
    Lu, Chao
    Zhuang, Xinying
    IEEE TRANSACTIONS ON CYBERNETICS, 2023, 53 (12) : 8013 - 8023
  • [8] Improved NSGA- II algorithm to solve energy-saving scheduling problem of flexible job shop considering transportation constraints
    Wang Y.
    Liu Y.
    Wu Y.
    Li S.
    Zong W.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (09): : 3028 - 3040
  • [9] A memetic algorithm to solve uncertain energy-efficient flow shop scheduling problems
    Mariappan Kadarkarainadar Marichelvam
    Mariappan Geetha
    The International Journal of Advanced Manufacturing Technology, 2021, 115 : 515 - 530
  • [10] A memetic algorithm to solve uncertain energy-efficient flow shop scheduling problems
    Marichelvam, Mariappan Kadarkarainadar
    Geetha, Mariappan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2021, 115 (1-2): : 515 - 530