Metaheuristic for the integrated electric vehicle and crew scheduling problem

被引:9
|
作者
Sistig, Hubert Maximilian [1 ,2 ,3 ]
Sauer, Dirk Uwe [1 ,2 ,4 ,5 ]
机构
[1] Rhein Westfal TH Aachen, Inst Power Elect & Elect Drives ISEA, Chair Electrochem Energy Convers & Storage Syst, Campus Blvd 89, D-52074 Aachen, Germany
[2] Julich Aachen Res Alliance, JARA Energy, Templergraben 55, D-52056 Aachen, Germany
[3] EBS Ebus Solut GmbH, Boxgraben 38, D-52064 Aachen, Germany
[4] Rhein Westfal TH Aachen, Inst Power Generat & Storage Syst PGS, EON ERC, Mathieustr 10, D-52074 Aachen, Germany
[5] Forschungszentrum Julich, Helmholtz Inst Munster, IEK 12, D-52425 Julich, Germany
关键词
Public transportation; Electric bus; Depot and opportunity charging; Integrated vehicle and crew scheduling; Adaptive large neighborhood search; Total cost of ownership; CHARGING INFRASTRUCTURE; ROUTING PROBLEM; TIME WINDOWS; ELECTRIFICATION; OPTIMIZATION; BUSES;
D O I
10.1016/j.apenergy.2023.120915
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Encouraged by international efforts to reduce greenhouse gases and local emissions, many public transport operators are converting their fleets to battery-powered electric buses. Public transport operators can choose between different electric bus concepts, with the total cost of ownership being the most important decision criterion. The associated strategic decisions regarding charging strategy, vehicle concept, and charging infrastructure have a significant impact on the operational planning of the electric buses. Motivated by this, this paper aims to analyze the interactions between electrification and operational planning, especially vehicle scheduling and crew scheduling. This allows us to make a more comprehensive comparison of different electrification concepts. Prior work has addressed the impact of electrification on vehicle scheduling but has neglected the interactions with crew scheduling. Crew scheduling dominates operational costs and planning for many public transport operators and must therefore be considered in all strategic decisions. For this reason, in this work we focused on integrated electric vehicle and crew scheduling problem. This allows us to calculate the total cost of ownership of different electric bus concepts under better representation of local conditions. We deal with the electric vehicle and crew scheduling problem with a metaheuristic based on Adaptive Large Neighborhood Search. We tested the developed methodology for a real-world bus route. Our results indicate that the constraints for crew scheduling significantly impact the total cost of ownership and the required number of vehicles of the different electrification concepts. Our case study suggests that the choice of the most cost-effective concept depends significantly on crew scheduling constraints. These findings imply that crew scheduling constraints should be considered as part of the local framework for bus fleet electrification.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Solution approaches for integrated vehicle and crew scheduling with electric buses
    Perumal, Shyam S. G.
    Dollevoet, Twan
    Huisman, Dennis
    Lusby, Richard M.
    Larsen, Jesper
    Riis, Morten
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2021, 132
  • [2] Electric Vehicle Charging Scheduling Problem: Heuristics and Metaheuristic Approaches
    Zaidi I.
    Oulamara A.
    Idoumghar L.
    Basset M.
    [J]. SN Computer Science, 4 (3)
  • [3] Integrated vehicle and crew scheduling: an overview
    Prata, Bruno de Athayde
    [J]. SISTEMAS & GESTAO, 2009, 4 (03): : 182 - 204
  • [4] Branching approaches for integrated vehicle and crew scheduling
    Mesquita, Marta
    Paias, Ana
    Respicio, Ana
    [J]. PUBLIC TRANSPORT, 2009, 1 (01) : 21 - 37
  • [5] Revisiting the richness of integrated vehicle and crew scheduling
    Ge, Liping
    Kliewer, Natalia
    Nourmohammadzadeh, Abtin
    Voss, Stefan
    Xie, Lin
    [J]. PUBLIC TRANSPORT, 2022,
  • [6] Minimum Cost Flow-Based Integrated Model for Electric Vehicle and Crew Scheduling
    Shen, Yindong
    Li, Yuanyuan
    [J]. JOURNAL OF ADVANCED TRANSPORTATION, 2023, 2023
  • [7] Set partitioning/covering-based approaches for the integrated vehicle and crew scheduling problem
    Mesquita, Marta
    Paias, Ana
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (05) : 1562 - 1575
  • [8] A metaheuristic for crew scheduling in a pickup-and-delivery problem with time windows
    Lucci, Mauro
    Severin, Daniel
    Zabala, Paula
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2023, 30 (02) : 970 - 1001
  • [9] Multiple-depot integrated vehicle and crew scheduling
    Huisman, D
    Freling, R
    Wagelmans, APM
    [J]. TRANSPORTATION SCIENCE, 2005, 39 (04) : 491 - 502
  • [10] The GRASP Metaheuristic for the Electric Vehicle Routing Problem
    Woller, David
    Kozak, Viktor
    Kulich, Miroslav
    [J]. MODELLING AND SIMULATION FOR AUTONOMOUS SYSTEMS (MESAS 2020), 2021, 12619 : 189 - 205