Expansion planning of the transmission network with high penetration of renewable generation: A multi-year two-stage adaptive robust optimization approach

被引:4
|
作者
Garcia-Cerezo, Alvaro [1 ]
Baringo, Luis [2 ]
Garcia-Bertrand, Raquel [2 ]
机构
[1] Univ Pontificia Comillas, Escuela Tecn Super Ingn ICAI, Inst Invest Tecnol, Santa Cruz Marcenado 26, Madrid 28015, Spain
[2] Univ Castilla La Mancha, Power & Energy Anal & Res Lab, Escueta Tecn Super Ingn Ind Ciudad Real, Campus Univ S-N, Ciudad Real 13071, Spain
关键词
Adaptive robust optimization; Multi-year approach; Operational flexibility; Renewable generation; Storage facilities; Transmission network expansion planning; ENERGY-STORAGE; SYSTEM;
D O I
10.1016/j.apenergy.2023.121653
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper addresses the multi-year two-stage expansion planning of the transmission network of a power system with high penetration of renewable generation modeling long-term uncertainty by using adaptive robust optimization. The multi-year nature of the problem is modeled by considering a comprehensive view of the planning horizon. A cardinality-constrained uncertainty set is used to model the future worst-case uncertainty realization of the peak power consumption of loads, along with the capacity and marginal production cost of generating units. Unlike previous works, we model certain features of the operation that are typically ignored in multi-year robust transmission network expansion planning problems, namely, the operational variability of renewable generating units, the operational flexibility of conventional generating units, and the non-convex operational feasibility sets of storage facilities. The solution procedure employed for this multi-year two-stage robust problem, which is formulated as a three-level problem, is based on the combination of the nested column-and-constraint generation algorithm with two exact acceleration techniques. We analyze the performance of the proposed model through the use of the IEEE 24-bus Reliability Test System and the IEEE 118-bus Test System. Numerical results show that the use of the multi-year approach leads to reductions in the total worst-case cost of up to 7% in comparison with the static and sequential static procedures. Moreover, an underestimation of the total worst-case cost of more than 8% is attained when ignoring certain operational constraints of conventional generating units and storage facilities. Lastly, a sensitivity analysis is presented in order to illustrate the impact of the maximum deviations of the uncertain parameters on the total worst-case cost.
引用
收藏
页数:22
相关论文
共 50 条
  • [1] Multi-year two-stage generation and transmission expansion planning: intermittent renewable energy sources integration for Brazilian interconnected power system
    Melo, Ranther
    Torres, Carlos
    Borba, Bruno
    Dias, Bruno
    [J]. ELECTRICAL ENGINEERING, 2022, 104 (04) : 2689 - 2701
  • [2] Distributionally Robust Co-optimization of Transmission Network Expansion Planning and Penetration Level of Renewable Generation
    Jingwei Hu
    Xiaoyuan Xu
    Hongyan Ma
    Zheng Yan
    [J]. Journal of Modern Power Systems and Clean Energy, 2022, (03) : 577 - 587
  • [3] Distributionally Robust Co-optimization of Transmission Network Expansion Planning and Penetration Level of Renewable Generation
    Hu, Jingwei
    Xu, Xiaoyuan
    Ma, Hongyan
    Yan, Zheng
    [J]. JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2022, 10 (03) : 577 - 587
  • [4] A Stochastic Adaptive Robust Optimization Approach for the Generation and Transmission Expansion Planning
    Baringo, Luis
    Baringo, Ana
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (01) : 792 - 802
  • [5] A Two-Stage Robust Transmission Expansion Planning Approach with Multi-Band Uncertainty Set
    Dai, Chenxi
    Wu, Lei
    [J]. 2016 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PESGM), 2016,
  • [6] A two-stage adaptive-robust optimization model for active distribution network with high penetration wind power generation
    Li, Chen
    Li, Yahan
    Xia, Shiwei
    Wang, Peng
    Ge, Qing
    Song, Liangyun
    Li, Yukai
    [J]. IET RENEWABLE POWER GENERATION, 2024, 18 (07) : 1204 - 1217
  • [7] Multi‐year two-stage generation and transmission expansion planning: intermittent renewable energy sources integration for Brazilian interconnected power system
    Ranther Melo
    Carlos Torres
    Bruno Borba
    Bruno Dias
    [J]. Electrical Engineering, 2022, 104 : 2689 - 2701
  • [8] Robust Transmission Network Expansion Planning With Uncertain Renewable Generation and Loads
    Jabr, R. A.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (04) : 4558 - 4567
  • [9] Robust generation expansion planning considering high penetration renewable energies uncertainty
    Abdalla, Omar H.
    Abu Adma, Maged A.
    Ahmed, Abdelmonem S.
    [J]. ENGINEERING REPORTS, 2020, 2 (07)
  • [10] Two-Stage Robust Expansion Planning of Transmission Network Considering Uncertainty of Offshore Wind Power
    Tian, Shuxin
    Han, Xue
    Fu, Yang
    Su, Xiangjing
    Li, Zhenkun
    [J]. Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2024, 58 (09): : 1400 - 1409