Developing process-yield-based acceptance sampling plans for AR(1) auto-correlated process

被引:3
|
作者
Banihashemi, Atefe [1 ]
Fallah Nezhad, Mohammad Saber [1 ]
Amiri, Amirhossein [2 ]
机构
[1] Yazd Univ, Dept Ind Engn, Yazd 89195741, Iran
[2] Shahed Univ, Dept Ind Engn, Tehran, Iran
关键词
First-order auto-regressive (AR(1)); Process yield index; Quick switching sampling system; Variables sampling plan; PROCESS CAPABILITY ANALYSIS; QUICK SWITCHING-SYSTEM; VARIABLES; INDEX; SCHEME; AUTOCORRELATION; CONSTRUCTION; QUALITY; DESIGN; PK;
D O I
10.1080/03610918.2021.1958845
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
Acceptance sampling plans include a sampling scheme and a set of rules to determine whether an inspection lot from a supplier should be accepted or rejected. This paper aims at developing two acceptance sampling plans by variables inspection, namely a quick switching sampling (QSS) system and the modified repetitive group sampling (Modified-RGS) plan based on the process yield index S-pk for the first-order auto-regressive (AR(1)) auto-correlated process. A minimization model is employed to solve the plan parameters. The performance of the proposed sampling plans is investigated and compared with the existing sampling plans through the operating characteristic (OC) curve and the average sample number (ASN) required for inspection. The simulation results confirm the advantages of the proposed plans over existing sampling plans. An example is presented to illustrate the applicability of the proposed plans.
引用
收藏
页码:4230 / 4251
页数:22
相关论文
共 50 条
  • [1] SAMPLING AN AUTO-CORRELATED PROCESS - THE AR(1)
    CRAIG, RG
    [J]. JOURNAL OF THE INTERNATIONAL ASSOCIATION FOR MATHEMATICAL GEOLOGY, 1984, 16 (08): : 745 - 751
  • [2] SAMPLING AN AUTO-CORRELATED PROCESS - THE AR(1) - COMMENT
    GILROY, EJ
    [J]. MATHEMATICAL GEOLOGY, 1986, 18 (02): : 247 - 251
  • [3] COMMENT ON SAMPLING AN AUTO-CORRELATED PROCESS - THE AR(1) - REPLY
    CRAIG, RG
    [J]. MATHEMATICAL GEOLOGY, 1986, 18 (02): : 253 - 255
  • [4] Acceptance sampling plans based on EWMA yield index for the first order autoregressive process
    Tamirat, Yeneneh
    Wang, Fu-Kwun
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2019, 70 (07) : 1179 - 1192
  • [5] Recognition of control chart patterns in auto-correlated process based on Random Forest
    Zhu Bo
    Liu Beibei
    Wan Yuwei
    Zhao Shengran
    [J]. 2018 IEEE INTERNATIONAL CONFERENCE ON SMART MANUFACTURING, INDUSTRIAL & LOGISTICS ENGINEERING (SMILE), 2018, : 53 - 57
  • [6] Optimal skip-lot sampling plan based on the yield index for auto-correlated data
    El Farme, Nabil
    [J]. COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2024, 53 (02) : 814 - 828
  • [7] VARYING COEFFICIENT MODELS FOR DATA WITH AUTO-CORRELATED ERROR PROCESS
    Chen, Zhao
    Li, Runze
    Li, Yan
    [J]. STATISTICA SINICA, 2015, 25 (02) : 709 - 723
  • [8] Confidence Intervals for Process Capability Indices under Auto-correlated Data
    Wang Binhui
    Chen Chuxiang
    Chen Xu
    [J]. MANAGEMENT ENGINEERING AND APPLICATIONS, 2010, : 674 - 679
  • [9] Designing acceptance sampling plans for polynomial profiles using EWMA statistics based on process yield index
    Kordpoor, Mona Boostan
    Ayoubi, Mona
    [J]. COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2024,
  • [10] Evaluation of Two Process Yields in Acceptance Sampling Plans
    Butt, K. A.
    Aslam, M.
    Wang, F. -K.
    Lee, H.
    Jun, C. -H.
    [J]. JOURNAL OF TESTING AND EVALUATION, 2018, 46 (02) : 756 - 763