Solving the flexible job shop scheduling and lot streaming problem with setup and transport resource constraints

被引:0
|
作者
Yunusoglu, Pinar [1 ,2 ]
Yildiz, Seyda Topaloglu [3 ]
机构
[1] Izmir Bakircay Univ, Dept Ind Engn, Izmir, Turkiye
[2] Dokuz Eylul Univ, Grad Sch Nat & Appl Sci, Izmir, Turkiye
[3] Dokuz Eylul Univ, Dept Ind Engn, Izmir, Turkiye
关键词
Flexible job shop scheduling; lot streaming; resource constraints; constraint programming; large neighbourhood search; GENETIC ALGORITHM; OPTIMIZATION ALGORITHM; NEIGHBORHOOD SEARCH; MAKESPAN; MACHINES; MODEL; TIMES;
D O I
10.1080/00207721.2023.2192220
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This article addresses the Flexible Job Shop Scheduling and Lot Streaming Problem (FJSSP-LS) under setup and transport resource constraints. While the related literature emphasises the lot streaming policy for time-based objectives, setup and transport resource constraints were not considered simultaneously with this policy, limiting the resulting schedule's applicability in practice. For this reason, we propose a novel Constraint Programming (CP) model enriched by an efficient variable and value ordering strategy specifically designed for the FJSSP-LS with resource constraints. We also present a CP-based iterative improvement method, CP-based Large Neighbourhood Search (CP-based LNS), that focuses on exploring large neighbourhoods through the CP model. Both models are initially tested for the FJSSP and have been shown to provide the best solutions to well-known benchmark instances. Next, they are used for the FJSSP-LS, and the proposed CP-based LNS improves the objective function value by 4.68 percent on average compared to the CP model for the generated test problems.
引用
收藏
页码:2443 / 2443
页数:1
相关论文
共 50 条
  • [1] Solving the flexible job shop scheduling and lot streaming problem with setup and transport resource constraints
    Yunusoglu, Pinar
    Topaloglu Yildiz, Seyda
    [J]. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2023, 10 (01)
  • [2] Policy Network for Solving Flexible Job Shop Scheduling Problem with Setup Times and Rescoure Constraints
    Xu, Ning
    Bu, Tian-Ming
    [J]. PROCEEDINGS OF THE 2022 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE COMPANION, GECCO 2022, 2022, : 208 - 211
  • [3] A Discrete Grey Wolf Optimizer for Solving Flexible Job Shop Scheduling Problem with Lot-streaming
    Zhang, Chunjiang
    Wang, Kaixin
    Ma, Qingji
    Li, Xinyu
    Gao, Liang
    [J]. PROCEEDINGS OF THE 2021 IEEE 24TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN (CSCWD), 2021, : 969 - 974
  • [4] A resource-constrained assembly job shop scheduling problem with Lot Streaming technique
    Wong, T. C.
    Chan, Felix T. S.
    Chan, L. Y.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (03) : 983 - 995
  • [5] An Enhanced Fruit Fly Optimization for the Flexible Job Shop Scheduling Problem with Lot Streaming
    Meng, Tao
    Duan, Jun-hua
    Pan, Quan-ke
    Chen, Qing-da
    Guo, Ju-tao
    [J]. 2018 37TH CHINESE CONTROL CONFERENCE (CCC), 2018, : 2345 - 2349
  • [6] An Enhanced Migrating Birds Optimization for the Flexible Job Shop Scheduling Problem with Lot Streaming
    Meng, Tao
    Pan, Quan-ke
    Chen, Qing-da
    [J]. INTELLIGENT COMPUTING THEORIES AND APPLICATION, PT I, 2018, 10954 : 769 - 779
  • [7] A matheuristic for flexible job shop scheduling problem with lot-streaming and machine reconfigurations
    Fan, Jiaxin
    Zhang, Chunjiang
    Shen, Weiming
    Gao, Liang
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (19) : 6565 - 6588
  • [8] Flexible job-shop scheduling problem with resource recovery constraints
    Vallikavungal Devassia, Jobish
    Angelica Salazar-Aguilar, M.
    Boyer, Vincent
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (09) : 3326 - 3343
  • [9] Flexible job-shop scheduling problem under resource constraints
    Chan, F. T. S.
    Wong, T. C.
    Chan, L. Y.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (11) : 2071 - 2089
  • [10] Solving the flexible job shop scheduling problem with sequence-dependent setup times
    Shen, Liji
    Dauzere-Peres, Stephane
    Neufeld, Janis S.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 265 (02) : 503 - 516