Strategies for decommissioning small nuclear reactors in Brazil

被引:0
|
作者
Neto, A. B. Caldas [1 ]
Silva, A. T. [2 ]
机构
[1] Navy Technol Ctr Sao Paulo CTMSP, Av Prof Lineu Prestes 2468, BR-05508000 Sao Paulo, SP, Brazil
[2] Energy & Nucl Res Inst IPEN CNEN, Av Prof Lineu Prestes 2242, BR-05508000 Sao Paulo, SP, Brazil
关键词
Nuclear reactors; Decommissioning; Radioactive waste management; Risk management;
D O I
10.1016/j.nucengdes.2023.112608
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The process of decommissioning nuclear reactors is a complex activity that involves various technical and administrative stages. Its main objective is to ensure the safety of the site, workers, the general public, and the environment during the execution of decommissioning activities, aiming for the release of the site from regulatory control. In the Brazilian context, it is essential to develop decommissioning strategies, taking into consideration the established technical and regulatory requirements, as well as following the guidelines of the Brazilian Nuclear Policy (BNP). Eight decommissioning strategies were proposed for small reactors, with different objectives and in different scenarios, encompassing 23 decommissioning approaches, divided into 6 groups: 1) decontamination and dismantling (DD); 2) radioactive waste (RW) management; 3) RW storage management; 4) human resources (HR) and knowledge management; 5) cost estimation; and 6) financial fund management. Additionally, 18 factors affecting the selection of these approaches were considered, taking into account particularities of the Brazilian context. A qualitative risk analysis was conducted using risk assessment techniques from the ABNT NBR ISO/IEC 31,010 standard, with a focus on the Multicriteria Decision Analysis (MCDA) technique. This qualitative analysis allowed for the evaluation of the approaches considering the current scenario and the future scenario, which includes possible changes in the BNP currently under discussion in the National Congress. The observations and results obtained in this study will be useful in guiding future efforts related to nuclear reactor decommissioning projects in Brazil. Based on the proposed strategies and considerations of safety, regulation, and governmental policies, it will be possible to plan and execute decommissioning activities more efficiently and safely.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Decommissioning small Nordic reactors
    Gitlin, Kristina
    NUCLEAR ENGINEERING INTERNATIONAL, 2019, 64 (780): : 26 - 28
  • [2] DECOMMISSIONING COMMERCIAL NUCLEAR-REACTORS
    SEFCIK, JA
    TECHNOLOGY REVIEW, 1979, 81 (07): : 56 - 71
  • [3] Decommissioning nuclear research reactors in Germany
    Hajek, W
    ATW-INTERNATIONALE ZEITSCHRIFT FUR KERNENERGIE, 2001, 46 (02): : 110 - +
  • [4] TRIAL DECOMMISSIONING OF NUCLEAR-REACTORS
    PYATUNIN, BA
    VAINSHTEIN, VV
    YURCHENKO, YF
    KRUGLOV, AK
    SAKHAROV, PV
    SOVIET ATOMIC ENERGY, 1990, 69 (03): : 739 - 744
  • [5] Life after nuclear: Decommissioning power reactors
    Lochbaum, David
    BULLETIN OF THE ATOMIC SCIENTISTS, 2014, 70 (04) : 26 - 36
  • [6] A graceful exit? Decommissioning nuclear power reactors
    Farber, D
    Weeks, J
    ENVIRONMENT, 2001, 43 (06): : 8 - 21
  • [7] NUCLEAR-REACTORS - 1975 SHUT DOWN FOR DECOMMISSIONING
    不详
    ATOMWIRTSCHAFT-ATOMTECHNIK, 1976, 21 (01): : 32 - 32
  • [8] ANALYSIS OF DECOMMISSIONING COSTS FOR NUCLEAR-POWER REACTORS
    GREENWOOD, DF
    WESTFAHL, RK
    RYMSHA, JW
    NUCLEAR TECHNOLOGY, 1983, 62 (02) : 190 - 206
  • [9] Structures and elements for the decommissioning cost estimations of nuclear research reactors
    Jeong, KwanSeong
    Lee, DongGyu
    Jung, ChongHun
    Lee, KuneWoo
    ANNALS OF NUCLEAR ENERGY, 2007, 34 (04) : 326 - 332
  • [10] Decisions on nuclear decommissioning strategies: Historical review
    Suh, Young A.
    Hornibrook, Carol
    Yim, Man-Sung
    PROGRESS IN NUCLEAR ENERGY, 2018, 106 : 34 - 43