Software reliability and cost models with warranty and life cycle

被引:4
|
作者
Shrivastava, Avinash K. [1 ]
Sharma, Ruchi [2 ]
Pham, Hoang [3 ]
机构
[1] Int Management Inst, Dept MIS & Analyt, Kolkata, W Bengal, India
[2] Neotia Univ, Dept Comp Sci, 2-4C Judges Court Rd, Kolkata 700027, W Bengal, India
[3] Rutgers State Univ, Dept Ind & Syst Engn, New Brunswick, NJ USA
关键词
Software reliability; cost benefit analysis; optimization; post-release testing; sensitivity; warranty; FAULT REMOVAL EFFICIENCY; RELEASE; TIME; UNCERTAINTY;
D O I
10.1177/1748006X221076273
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With increasing number of tech-savvy users, the demand for software with advanced features is also growing exponentially. To meet these expectations, software firms are coming up with innovative strategies to attract customers to buy their products and remain loyal. One of the key strategies is to provide product assurance is post-sales support. Software firms provide a warranty to fix the failures encountered during the operational phase for a pre-defined time period. Software reliability literature consists of various modeling framework to decide release time under pre-defined warranty period under the consideration of no post-release testing. Very limited work has been done in the direction of post-release testing with warranty. In this work, we propose a framework to obtain optimal release and warranty time of software to minimize the overall cost under reliability constraint. We have provided the algorithm to obtain the analytical solution of release and warranty time. To make our proposed work more realistic we have considered the change point phenomenon and imperfect debugging of fault in our modeling framework. We have also conducted a sensitivity analysis on the model parameters to check their impact of the firms scheduling strategy. The proposed work is validated on a real-life data set.
引用
收藏
页码:166 / 179
页数:14
相关论文
共 50 条
  • [1] RELIABILITY COST IN SOFTWARE LIFE-CYCLE MODELS
    LIN, HH
    KUO, W
    [J]. PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1987, (SYM): : 364 - 368
  • [2] Reliability-Informed Life Cycle Warranty Cost and Life Cycle Analysis of Newly Manufactured and Remanufactured Units
    Li, Meng
    Nemani, Venkat P.
    Liu, Jinqiang
    Lee, Michael A.
    Ahmed, Navaid
    Kremer, Gul E.
    Hu, Chao
    [J]. JOURNAL OF MECHANICAL DESIGN, 2021, 143 (11)
  • [3] Minimizing life cycle cost by managing product reliability via validation plan and warranty return cost
    Kleyner, Andre
    Sandborn, Peter
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (02) : 796 - 807
  • [4] Reliability-based simulation software for reducing warranty cost
    Nasser, AL
    Dey, A
    Tryon, RG
    [J]. SEVENTH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY AND QUALITY IN DESIGN, 2002, : 11 - 15
  • [5] The Software Reliability Growth Models for Software Life-Cycle Based on NHPP
    Nam, Kyung H.
    Kim, Do Hoon
    [J]. KOREAN JOURNAL OF APPLIED STATISTICS, 2010, 23 (03) : 573 - 584
  • [6] WARRANTY PRICING WITH A LIFE-CYCLE COST MODEL
    ROTZ, AO
    [J]. PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1986, (SYM): : 454 - 456
  • [7] Economic analysis of software release problems with warranty cost and reliability requirement
    Dept. of Social Systems Engineering, Fac. Eng., Tottori Univ., 680-8552, Tottori-shi, Japan
    [J]. Reliab Eng Syst Saf, 1 (49-55):
  • [8] Economic analysis of software release problems with warranty cost and reliability requirement
    Kimura, M
    Toyota, T
    Yamada, S
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 1999, 66 (01) : 49 - 55
  • [9] Study of the warranty cost model for software reliability with an imperfect debugging phenomenon
    Department of Information Technology, Salalah College of Technology, Post Box: 608, Salalah-211, Oman
    [J]. Turk J Electr Eng Comput Sci, 2007, 3 (369-381):
  • [10] Planning models for software reliability and cost
    Helander, ME
    Zhao, M
    Ohlsson, N
    [J]. IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 1998, 24 (06) : 420 - 434