Evaluation of time allocated for bid preparation in national competitive bidding in the Sri Lankan construction industry

被引:0
|
作者
Hasantha, Malik Lakshan [1 ]
Waidyasekara, Anuradha Samarajeewa [1 ]
Victar, Hasith Chathuranga [1 ]
机构
[1] Univ Moratuwa, Dept Bldg Econ, Moratuwa, Sri Lanka
关键词
Bidding period; Competitive bidding; Tendering; National Procurement Agency (NPA); National competitive bidding (NCB); SUSTAINABILITY; CHALLENGES; DECISION; PROJECTS;
D O I
10.1108/ECAM-11-2023-1151
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeInsufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for preparing a bid proposal as per the National Competitive Bidding (NCB) in the Sri Lankan context.Design/methodology/approachThe study has adopted a mixed method approach and expert interviews and document review to detect, analyse and validate the issues, and solutions based on NCB along with the adequacy of the allocated bidding period used as main data collection tools. Both qualitative and quantitative data were analysed through manual content analysis and inferential analysis respectively.FindingsOverall, 24 local issues with the existing competitive bidding process and solutions for each were identified. Among the 24 local issues, it was unanimously agreed by all interviewees that three specific issues require attention and improvement. These issues are related to the standard and incompleteness of bidding documents, inaccurate BOQ quantities measured by the consultant or the main contractor, and the excessive number of bidding document amendments by the consultant. It was revealed that a maximum of 42 calendar days (6 weeks) is sufficient for the bidding process while a minimum of 21 calendar days (3 weeks) is insufficient.Originality/valueThe findings of this study would be recommended that Information and Communication Technology Agency (ICTA) understand the necessity of revising the NCB reference to the time allocated for the preparation of bids. By recognising the importance of sufficient time allocation for bid preparation, this research serves as a practical guide for authorities involved in policy formulation, aiding them in implementing revisions that align with the dynamic requirements of bidding procedures.
引用
收藏
页数:28
相关论文
共 44 条
  • [1] Determining bid markup and resources allocated to cost estimation in competitive bidding
    Takano, Yuichi
    Ishii, Nobuaki
    Muraki, Masaaki
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 85 : 358 - 368
  • [2] THE WINNER'S CURSE IN THE SRI LANKAN CONSTRUCTION INDUSTRY
    Tan, Willie
    Suranga, Himal
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2008, 8 (01) : 29 - 35
  • [3] Study on Use of Glass in Sri Lankan Construction Industry
    Fowza, M. J. F.
    Hidallana-Gamage, H. D.
    [J]. MERCON 2020: 6TH INTERNATIONAL MULTIDISCIPLINARY MORATUWA ENGINEERING RESEARCH CONFERENCE (MERCON), 2020, : 107 - 112
  • [4] Competitive bidding strategy model and software system for bid preparation
    Fayek, A
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (01): : 1 - 10
  • [5] Adjudication Practice and Its Enforceability in the Sri Lankan Construction Industry
    Jayasinghe, Harshi Madhuka
    Ramachandra, Thanuja
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2016, 8 (01)
  • [6] Current Practices of Sustainable Procurement in the Sri Lankan Construction Industry
    Rosayuru, H. D. R. R.
    Waidyasekara, K. G. A. S.
    Wijewickrama, M. K. C. S.
    [J]. 2018 MORATUWA ENGINEERING RESEARCH CONFERENCE (MERCON) 4TH INTERNATIONAL MULTIDISCIPLINARY ENGINEERING RESEARCH CONFERENCE, 2018, : 144 - 149
  • [7] Sustainable Practices Through Competitive Capabilities in the Apparel Industry: Sri Lankan Experience
    Jayarathne, P. G. S. A.
    Sachithra, Vilani
    Dewasiri, N. J.
    [J]. FIIB BUSINESS REVIEW, 2021,
  • [8] Key performance indicators of value management in the Sri Lankan construction industry
    Madushika, W. H. S.
    Perera, B. A. K. S.
    Ekanayake, B. J.
    Shen, G. Q. P.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (02) : 157 - 168
  • [9] Evaluating Cost and Time Performance of Sri Lankan Construction Projects
    Rathnayake, Asitha
    Ranasinghe, Malik
    [J]. ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2020, 53 (03): : 79 - 89
  • [10] Influence of Labour Experience in the Generation of Construction Material Waste in the Sri Lankan Construction Industry
    Karunasena, Gayani
    Fernando, Gayan
    Ashokkumar, Dilogini
    Liu, Chunlu
    [J]. SUSTAINABILITY, 2023, 15 (06)