Robust co-planning of AC/DC transmission network and energy storage considering uncertainty of renewable energy

被引:12
|
作者
Wu, Yunyun [1 ]
Fang, Jiakun [1 ]
Ai, Xiaomeng [1 ]
Xue, Xizhen [1 ]
Cui, Shichang [1 ]
Chen, Xia [1 ]
Wen, Jinyu [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Elect & Elect Engn, State Key Lab Adv Electromagnet Engn & Technol, Wuhan 430074, Peoples R China
关键词
Transmission expansion planning; Energy storage configuration; Renewable energy; Hybrid AC; DC transmission network; Robust optimization; EXPANSION; OPTIMIZATION; INVESTMENT; DISPATCH; SYSTEMS;
D O I
10.1016/j.apenergy.2023.120933
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper proposes a robust co-planning model of hybrid AC/DC transmission network and energy storage with the penetration of renewable energy to promote the accommodation of renewable energy and to avoid invest-ment redundancy. The energy storage configured in the power grid can improve the power flow distribution and alleviate transmission congestion, postponing the investment of new devices. A deterministic co-planning model is firstly developed considering voltage fluctuation, reactive power flow and the flexibility of voltage source converter based high voltage direct current (VSC-HVDC). To address the solving complexity caused by the non -convexity of the model, second-order cone programming (SOCP) is applied to transform the proposed model into a convex problem. To cope with the uncertainty of renewable energy, the robust co-planning formulation is established, where the data-adaptive uncertainty set with the extreme scenario method is introduced to describe renewable generation uncertainty. The column-and-constraint generation (C&CG) algorithm is adopted to decompose the robust co-planning problem into a master problem and several slave problems, which reduces the calculation scale and accelerates the solving process. Two case studies on a modified Garver's 6-bus system and a practical Jiangxi province power system in China are carried out to verify the effectiveness and superiority of the proposed robust co-planning model.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Robust Optimization Model of AC/DC Hybrid Distribution Network Considering Renewable Energy Uncertainty
    Ma, Yue
    Dong, Xiaoming
    Yang, Xue
    Liu, Zhengqi
    Jia, Xueyong
    Sun, Hongwen
    2022 4TH INTERNATIONAL CONFERENCE ON SMART POWER & INTERNET ENERGY SYSTEMS, SPIES, 2022, : 679 - 684
  • [2] Robust Co-Planning of Energy Storage and Transmission Line With Mixed Integer Recourse
    Wang, Siyuan
    Geng, Guangchao
    Jiang, Quanyuan
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2019, 34 (06) : 4728 - 4738
  • [3] Co-Planning of Investments in Transmission and Merchant Energy Storage
    Dvorkin, Yury
    Fernandez-Blanco, Ricardo
    Wang, Yishen
    Xu, Bolun
    Kirschen, Daniel S.
    Pandzic, Hrvoje
    Watson, Jean-Paul
    Silva-Monroy, Cesar A.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (01) : 245 - 256
  • [4] Power generation-network-load-energy storage co-planning under uncertainty
    Ma, Su
    Liu, Lu
    Cheng, Haozhong
    FRONTIERS IN ENERGY RESEARCH, 2024, 12
  • [5] Security constrained co-planning of transmission expansion and energy storage
    Gan, Wei
    Ai, Xiaomeng
    Fang, Jiakun
    Yan, Mingyu
    Yao, Wei
    Zuo, Wenping
    Wen, Jinyu
    APPLIED ENERGY, 2019, 239 : 383 - 394
  • [6] Robust co-planning of transmission expansion and merchant energy storage investments considering long- and short-term uncertainties
    Radmanesh, Hamid
    Barkam, Ehsan
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2024, 160
  • [7] Frequency-constrained Co-planning of Generation and Energy Storage with High-penetration Renewable Energy
    Zhang, Chengming
    Liu, Lu
    Cheng, Haozhong
    Liu, Dundun
    Zhang, Jianping
    Li, Gang
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2021, 9 (04) : 760 - 775
  • [8] Frequency-constrained Co-planning of Generation and Energy Storage with High-penetration Renewable Energy
    Chengming Zhang
    Lu Liu
    Haozhong Cheng
    Dundun Liu
    Jianping Zhang
    Gang Li
    Journal of Modern Power Systems and Clean Energy, 2021, 9 (04) : 760 - 775
  • [9] Transmission Network Expansion Planning Considering Renewable Energy Target
    Chatthaworn, Rongrit
    Chaitusaney, Surachai
    2014 11TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING/ELECTRONICS, COMPUTER, TELECOMMUNICATIONS AND INFORMATION TECHNOLOGY (ECTI-CON), 2014,
  • [10] Robust Co-Planning of Transmission Network and B-SMES
    Wang, Yu-Hong
    Hu, Sheng-Jie
    Song, Yu-Yan
    Zeng, Qi
    Zheng, Zong-Sheng
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2021, 31 (08)