Analysis of unstable block by discrete element method during blasting excavation of fractured rock mass in underground mine

被引:10
|
作者
Gu, Zhongyuan [1 ]
Cao, Miaocong [1 ]
机构
[1] Changchun Inst Technol, Sch Invest & Surveying Engn, Changchun 130021, Peoples R China
关键词
Fractured rock mass; Blasting disturbance; Dangerous block; 3DEC; DISCONTINUITIES; STABILITY;
D O I
10.1016/j.heliyon.2023.e22558
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
During the excavation process in fractured rock masses in underground mines, blasting excavation can cause dangerous block collapses on surrounding rock. The applicable blasting method can effectively reduce the damage of surrounding rock caused by blasting disturbance. In order to investigate the impact of blasting disturbances of dangerous blocks in fractured rock mass drift, this study focuses on the instability characteristics of dangerous blocks during the excavation process in a mine located in Jilin Province. Based on detailed detection of discontinuities char-acteristics in the study area, the damage effects of shaped charge hydraulic blasting and con-ventional blasting on surrounding rock structure are analyzed and compared by using equivalent static method. The 3DEC discrete element software was used to analyze the instability characteristics of surrounding rock dangerous blocks under these two different blasting methods. The results indicate that using shaped charge hydraulic blasting can effectively reduce the impact of blasting disturbances on the excavated rock mass and minimize dangerous block collapses during drift excavation.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Stability analysis of block in surrounding rock mass of large underground excavation
    College of Environment and Civil Engineering, Chengdu University of Technology, Chengdu 610059, China
    不详
    不详
    Yanshilixue Yu Gongcheng Xuebao, 2006, 2 (306-311):
  • [2] Stability analysis of block in the surrounding rock mass of a large underground excavation
    Liu, J
    Li, ZK
    Zhang, ZY
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2004, 19 (01) : 35 - 44
  • [3] Discrete modelling of excavation in fractured rock by NSCD method
    Department of Civil Engineering, University of Transport and Communications, Hanoi, Viet Nam
    不详
    Geotech Eng, 1 (62-68):
  • [4] Discrete Modelling of Excavation in Fractured Rock by NSCD Method
    Tran Thi Thu Hang
    Dubois, Frederic
    GEOTECHNICAL ENGINEERING, 2016, 47 (01): : 62 - 68
  • [5] Analysis of vibration signals near ground surface during blasting excavation of a tunnel in fractured rock
    Deng, Zuhua
    Meng, Junyu
    Deng, Yongfeng
    Ni, Junjun
    Ye, Daicheng
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [6] RECOMMENDATIONS ON THE PRELIMINARY ESTIMATE OF THE VOLUME OF FRACTURED ROCK DURING COMMERCIAL BLASTING EXCAVATION
    SAVIN, SN
    AVDEEV, EZ
    JOURNAL OF MINING SCIENCE, 1992, 28 (01) : 40 - 44
  • [7] Numerical Study of Rock Damage Mechanism Induced by Blasting Excavation Using Finite Discrete Element Method
    Ke, Wenhui
    Wang, Xun
    Yan, Chengzeng
    Qiao, Chuyin
    APPLIED SCIENCES-BASEL, 2022, 12 (15):
  • [8] Risk analysis of fractured rock mass underground structures
    Napa-Garcia, Gian Franco
    Beck, Andre Teofilo
    Celestino, Tarcisio B.
    GEORISK-ASSESSMENT AND MANAGEMENT OF RISK FOR ENGINEERED SYSTEMS AND GEOHAZARDS, 2018, 12 (02) : 123 - 134
  • [9] Rock mass damaged zone caused by blasting during tunnel excavation
    Zona oštećenja stijenske mase pri iskopu tunela miniranjem
    1600, University of Zagreb, Faculty of Mining, Geology and Petroleum Engineering (24):
  • [10] ROCK MASS DAMAGED ZONE CAUSED BY BLASTING DURING TUNNEL EXCAVATION
    Anticevic, Hrvoje
    Dobrilovic, Mario
    Perkovic, Hrvoje
    RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2012, 24 (01): : 1 - 9