EU DEMO;
Power conversion system;
Water cooled lithium lead bed breeding blanket;
Small energy storage system;
GateCycle;
CONFIGURATION;
D O I:
10.1016/j.fusengdes.2023.113502
中图分类号:
TL [原子能技术];
O571 [原子核物理学];
学科分类号:
0827 ;
082701 ;
摘要:
EU-DEMO will be a DEMOnstration Fusion power plant that is being designed to demonstrate the production of electricity from nuclear fusion at the level of a few hundred MW. The Primary Heat Transfer System (PHTS) transfers heat from the reactor to the Power Conversion System (PCS, the secondary circuit), responsible for converting the thermal power into electricity. According to the recent DEMO Energy Map data, In-Vessel components such as Breeding Blanket (BB), Divertor (DIV), Limiters, Vacuum Vessel and Auxiliaries feature uncertainties in generated thermal power. Some of them serve PCS as heat sources, namely: BB and DIV. Two reference concepts of the BB have been selected as a result of the DEMO pre-conceptual studies: the Helium Cooled Pebble Bed and the Water Cooled Lithium-Lead (WCLL). Because of the mentioned uncertainties regarding the distribution of energy released from fusion among the different reactor heat sources, several possible operational scenarios are considered. One of the challenges faced by the DEMO plant designers is the pulsed operation of the tokamak: plasma burn pulses (2 h) will be separated by dwell phases (10 min). To compensate drastic power reduction of the reactor heat sources during dwell, an Energy Storage System (ESS) of different sizes is included in considered DEMO plant configurations. Our work is focused on the design and analysis of the DEMO PCS circuit for the option WCLL BB with the small ESS. We create the GateCycle model of the "maximum of maximum" PCS cycle, in which the plant components are sized to incorporate the maximum power of all the reactor heat sources. Operation of the PCS circuit during the pulse (in the "Design" mode) and during dwell (in the "Off-design" mode with the fixed design of all the circuit components) is simulated, to verify the system performance and the potential feasibility of the considered PCS concept.
机构:
North China Electric Power Research Institute, Xicheng District, Beijing 100045, ChinaNorth China Electric Power Research Institute, Xicheng District, Beijing 100045, China
Feng, Chen-Hu
Gao, Yong-Feng
论文数: 0引用数: 0
h-index: 0
机构:
North United Power Co., Ltd., Hohhot 010020, Inner Mongolia Autonomous Region, ChinaNorth China Electric Power Research Institute, Xicheng District, Beijing 100045, China
Gao, Yong-Feng
Qin, Jun-Jie
论文数: 0引用数: 0
h-index: 0
机构:
Inner Mongolia Datang International Tuoketuo Power Generation Co., Ltd, Hohhot 010206, Inner Mongolia Autonomous Region, ChinaNorth China Electric Power Research Institute, Xicheng District, Beijing 100045, China
Qin, Jun-Jie
Liu, Ping
论文数: 0引用数: 0
h-index: 0
机构:
North China Electric Power Research Institute, Xicheng District, Beijing 100045, ChinaNorth China Electric Power Research Institute, Xicheng District, Beijing 100045, China
Liu, Ping
Liu, Hai-Dong
论文数: 0引用数: 0
h-index: 0
机构:
Inner Mongolia Datang International Tuoketuo Power Generation Co., Ltd, Hohhot 010206, Inner Mongolia Autonomous Region, ChinaNorth China Electric Power Research Institute, Xicheng District, Beijing 100045, China
Liu, Hai-Dong
Chen, Ning
论文数: 0引用数: 0
h-index: 0
机构:
North China Electric Power Research Institute, Xicheng District, Beijing 100045, ChinaNorth China Electric Power Research Institute, Xicheng District, Beijing 100045, China
Chen, Ning
Sun, Yu
论文数: 0引用数: 0
h-index: 0
机构:
North China Electric Power Research Institute, Xicheng District, Beijing 100045, ChinaNorth China Electric Power Research Institute, Xicheng District, Beijing 100045, China