Plow Pulling Installation of Steel Pipelines

被引:0
|
作者
Vogler, Justus [1 ]
机构
[1] Innovative Trenching USA Inc, Edmonton, AB, Canada
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Installation of composite pipelines via plowing has been an accepted industry standard for decades. By applying similar principles from composite pipe plowing we wanted to see if steel pipe plowing was viable and had similar benefits of increased production during the installation and remediation phases. The biggest challenge to overcome was the lack of flexibility that steel pipe has when compared to composite style pipes. Composite pipe can be plowed via an enlarged chute, similar to a cable, with a specific bend radius that is larger than the minimum bend radius of the pipe. We developed a pipe pulling method which functions as a hybrid of a horizontal directional drill (HDD) and conventional plowing method. The plow is modified and fitted with a specialized expander head, and the steel drag section is installed inside the expander head. The plow then installs the pipe, which is set up as if it were an HDD pullback, by pulling it into the ground. General findings were that installation of steel pipelines is possible using the pipe pulling method. Installation efficiency increases varied and were heavily dependent on right of way alignment. The best utilization of the method was on long sections. This is due to the travel time between sections, setup, and take down making up the majority of time required versus actual plowing. This constant setup time is very consistent between long and short sections. The longest section of pipe installed was just over 3,100 linear feet (install plowing time 1.5 h) versus the shortest section of 300 linear feet (install plowing time 0.25 h). Right of Way (ROW) restoration time and effort was dramatically reduced using the pulling method. Conventional plow rip was restored via track packing. Topsoil stripping was not required, allowing vegetation regrowth and complete restoration after three weeks in summer condition. Soil saturation affects the restoration, with dryer soils causing more plow rip heave, versus wetter soils leaving more significant rutting that requires clean up. The steel pull method, while deemed successful, has limitations and cannot be applied to all pipeline installation projects. Soil conditions, ROW alignment, terrain, and pipe coating material will all impact production gains. The paper also discusses steps to mitigate some of these factors to make the method applicable to a wider range of projects.
引用
收藏
页码:251 / 260
页数:10
相关论文
共 50 条
  • [1] PLOW INSTALLATION OF PLASTIC DRAIN TUBING
    WILLARDSON, LS
    [J]. TRANSACTIONS OF THE ASAE, 1974, 17 (01): : 172 - 174
  • [2] PLOW INSTALLATION OF PLASTIC DRAIN TUBING
    WILLARDS.LS
    [J]. AGRICULTURAL ENGINEERING, 1970, 51 (05): : 289 - &
  • [3] UNDERWATER PLOW PROVIDES PROTECTION FOR OFFSHORE PIPELINES
    不详
    [J]. DESIGN NEWS, 1978, 34 (09) : 16 - 16
  • [4] COMPARISON OF TRENCHLESS DRAIN PLOW AND TRENCH METHODS OF DRAINAGE INSTALLATION
    KANWAR, RS
    COLVIN, TS
    MELVIN, SW
    [J]. TRANSACTIONS OF THE ASAE, 1986, 29 (02): : 456 - 461
  • [5] BEACHPULL INSTALLATION OF LONG PIPELINES AND CABLES
    Bhargav, Kiran
    Durairaj, Senthilkumar
    [J]. PROCEEDINGS OF THE ASME 31ST INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARTIC ENGINEERING, VOL 3, 2012, : 19 - 30
  • [6] Seabed pipelines: The influence of installation effects
    White, D. J.
    [J]. INSTALLATION EFFECTS IN GEOTECHNICAL ENGINEERING, 2013, : 146 - 161
  • [7] INSTALLATION OF PIPELINES IN DEEP-WATER
    LOCHRIDGE, JC
    [J]. ERDOL & KOHLE ERDGAS PETROCHEMIE, 1979, 32 (10): : 478 - 484
  • [8] DEEPWATER PIPELINES: DESIGN, INSTALLATION AND TESTING
    Pandit, Saurav
    Kishore, Raj
    [J]. PROCEEDINGS OF THE ASME INDIA INTERNATIONAL OIL AND GAS PIPELINE CONFERENCE, 2019, 2019,
  • [9] Development of a weld enamel technology for the installation of steel pipelines with an internal silicate-enamel coating
    Ryabova, A., V
    Yatsenko, E. A.
    Klimova, L., V
    Fanda, A. Yu
    [J]. MATERIALS TODAY-PROCEEDINGS, 2021, 38 : 1491 - 1494
  • [10] The Trouble with Teamwork: Doukhobor Women's Plow Pulling in Western Canada, 1899
    Androsoff, Ashleigh
    [J]. CANADIAN HISTORICAL REVIEW, 2019, 100 (04): : 540 - 563