Development of a Composite Project Performance Index for the New Engineering Contract (NECPPI) of construction projects in Hong Kong: a Delphi study

被引:2
|
作者
Yeung, John F. Y. [1 ]
Chan, Daniel W. M. [2 ]
Chan, Joseph H. L. [3 ]
Lok, K. L. [1 ]
机构
[1] Hong Kong Baptist Univ, Coll Int Educ, Sch Continuing Educ, Hong Kong, Peoples R China
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Peoples R China
[3] Hong Kong Polytech Univ, Coll Profess & Continuing Educ, Hong Kong, Peoples R China
关键词
Key performance indicators (KPIs); performance evaluation; New Engineering Contract (NEC); engineering and construction contract (ECC); Delphi study; Hong Kong; BENEFITS; PERSPECTIVE;
D O I
10.1080/15623599.2022.2100058
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Over the past three decades, a basket of research studies on New Engineering Contract (NEC) has been conducted in the construction management discipline. In fact, there is adequate evidence that an increasing number of client organisations have been adopting a NEC approach to undertake their building and construction projects both locally and worldwide during the last three decades. With the perceived benefits that NEC brings about, research into the Key Performance Indicators (KPIs) to evaluate the success of NEC projects in construction becomes all the more important because it can help set a benchmark for measuring the overall performance level of NEC projects. Although there are some related studies and papers on this research area, few, if any, comprehensive and systematic studies have focused on developing a comprehensive, objective, reliable and practical performance evaluation model for NEC projects. A benchmarking model has been developed in this paper using the Delphi survey technique to objectively measure the performance of the Engineering and Construction Contract (ECC) of NEC projects in Hong Kong based on a consolidated KPIs' conceptual framework for NEC projects. Four rounds of Delphi questionnaire survey were conducted with 16 construction experts in Hong Kong and the United Kingdom. The results revealed that the top seven weighted KPIs to evaluate the success of NEC projects in Hong Kong include: (1) time performance; (2) safety performance; (3) quality performance; (4) development of mutual trust and cooperation; (5) cost performance; (6) equitable risk management mechanism; and (7) project team satisfaction. A statistically significant consensus on the top seven weighted KPIs was also obtained. Finally, a composite Project Performance Index for NEC projects (NECPPI) in Hong Kong was derived to provide an all-round assessment of NEC project performance. Different NEC projects can now be assessed on the same basis for benchmarking purposes. Construction senior executives and project managers can thus use the Index to measure, evaluate and improve the performance of their NEC projects to strive for construction excellence. Although the NECPPI was established locally in Hong Kong, the research methodology could be replicated in other parts of the world such as the United Kingdom or other European countries to produce similar indices for international comparisons. Such and extension would aid the understanding of managing NEC projects across different geographic locations.
引用
收藏
页码:2804 / 2817
页数:14
相关论文
共 14 条
  • [1] Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study
    Yeung, John F. Y.
    Chan, Albert P. C.
    Chan, Daniel W. M.
    Li, Leong Kwan
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2007, 25 (12) : 1219 - 1237
  • [2] The challenges of adopting new engineering contract: a Hong Kong study
    Lau, Chung Him
    Mesthrige, Jayantha Wadu
    Lam, Patrick T. I.
    Javed, Arshad Ali
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (10) : 2389 - 2409
  • [3] Development of an impact-on-performance index (IPI) for construction projects in Malaysia: a Delphi study
    Mansour, Husam
    Aminudin, Eeydzah
    Omar, Balqis
    Al-Sarayreh, Ali
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (11) : 2003 - 2012
  • [4] Trust, contract control and project performance in construction projects: An empirical study in China
    School of Economics and Management, China University of Geosciences , Wuhan 430074, China
    [J]. Adv. Inf. Sci. Serv. Sci., 2012, 7 (90-98):
  • [5] Developing a Performance Index for Relationship-Based Construction Projects in Australia: Delphi Study
    Yeung, John F. Y.
    Chan, Albert P. C.
    Chan, Daniel W. M.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2009, 25 (02) : 59 - 68
  • [6] Smart construction site in mega construction projects: A case study on island tunneling project of Hong Kong-Zhuhai-Macao Bridge
    Hongtao ZHOU
    Hongwei WANG
    Wei ZENG
    [J]. Frontiers of Engineering Management, 2018, 5 (01) : 78 - 87
  • [7] Smart construction site in mega construction projects: A case study on island tunneling project of Hong Kong-Zhuhai-Macao Bridge
    Hongtao ZHOU
    Hongwei WANG
    Wei ZENG
    [J]. Frontiers of Engineering Management, 2018, (01) : 78 - 87
  • [8] Smart construction site in mega construction projects: A case study on island tunneling project of Hong Kong-Zhuhai-Macao Bridge
    Zhou, Hongtao
    Wang, Hongwei
    Zeng, Wei
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2018, 5 (01) : 78 - 87
  • [9] Developing project evaluation models for smart sustainable practices implementation in construction projects: a comparative study between Nigeria and Hong Kong
    Olawumi, Timothy O.
    Chan, Daniel W. M.
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (03) : 1522 - 1552
  • [10] Deploying Value Engineering Strategies for Ameliorating Construction Project Management Performance: A Delphi-SWARA Study Approach
    Nejatyan, Esmaeil
    Sarvari, Hadi
    Hosseini, Seyed Abbas
    Javanshir, Hassan
    [J]. BUILDINGS, 2024, 14 (08)