Exchanging Progress Information Using IFC-Based BIM for Automated Progress Monitoring

被引:4
|
作者
Sheik, Noaman Akbar [1 ,2 ]
Veelaert, Peter [1 ]
Deruyter, Greet [2 ]
机构
[1] Univ Ghent, Dept Telecommun & Informat Proc, TELIN IPI, B-9000 Ghent, Belgium
[2] Univ Ghent, Dept Civil Engn, B-9000 Ghent, Belgium
关键词
BIM updating; progress monitoring; IFC-based BIM; automation; Building Information Model; scheduling; MODEL; IMPLEMENTATION;
D O I
10.3390/buildings13092390
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
BIM has become an intrinsic tool in managing building projects due to its ability to comprehensively represent information in digital form. However, using BIM as an information exchange tool is still in its infancy, particularly with regard to construction progress monitoring beyond time schedule information. The current study focuses on the development of an automated progress monitoring framework based on an IFC-based BIM and provides an extensive methodology based on a structured task-based approach in accordance with the latest IFC4.x schema in four stages. The first stage creates the appropriate IFC entities, which are then enriched with their values in the second stage. The third stage integrates the actual progress information, which requires regular updating from the construction site. Finally, the fourth stage enables the retrieval of progress information, which is then reported in a user-friendly format along with the estimation of additional progress indicators. The proposed method successfully integrated the progress information into their IFC-based BIM models, demonstrating its practical use for monitoring construction progress. In the end, a web-based application was also developed that made use of progress information stored within the standardized hierarchy of the updated IFC-based BIM to facilitate efficient reporting.
引用
收藏
页数:29
相关论文
共 50 条
  • [1] Automated Progress Monitoring Using Unordered Daily Construction Photographs and IFC-Based Building Information Models
    Golparvar-Fard, Mani
    Pena-Mora, Feniosky
    Savarese, Silvio
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2015, 29 (01)
  • [2] Automated Schedule and Progress Updating of IFC-Based 4D BIMs
    Hamledari, Hesam
    McCabe, Brenda
    Davari, Shakiba
    Shahi, Arash
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (04)
  • [3] Automation of Construction Progress Monitoring by Integrating 3D Point Cloud Data with an IFC-Based BIM Model
    Kavaliauskas, Paulius
    Fernandez, Jaime B.
    McGuinness, Kevin
    Jurelionis, Andrius
    BUILDINGS, 2022, 12 (10)
  • [4] Automated Extraction of Locational Information from IFC-Based Building Information Models
    Chong, Oscar Wong
    Zhang, Jiansong
    CONSTRUCTION RESEARCH CONGRESS 2024: ADVANCED TECHNOLOGIES, AUTOMATION, AND COMPUTER APPLICATIONS IN CONSTRUCTION, 2024, : 148 - 156
  • [5] Registration of Building Scan with IFC-Based BIM Using the Corner Points
    Sheik, Noaman Akbar
    Veelaert, Peter
    Deruyter, Greet
    REMOTE SENSING, 2022, 14 (20)
  • [6] BIM and Sustainable Construction Integration: An IFC-Based Model
    Ilhan, Bahriye
    Yaman, Hakan
    MEGARON, 2015, 10 (03): : 440 - 448
  • [7] IFC-Based BIM-to-BEM Model Transformation
    Ramaji, Issa J.
    Messner, John I.
    Mostavi, Ehsan
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2020, 34 (03)
  • [8] IFC-Based Semantic Segmentation and Semantic Enrichment of BIM for Bridges
    Li, Hang
    Yang, Fan
    Zhang, Jiansong
    CONSTRUCTION RESEARCH CONGRESS 2024: ADVANCED TECHNOLOGIES, AUTOMATION, AND COMPUTER APPLICATIONS IN CONSTRUCTION, 2024, : 597 - 606
  • [9] Automated IFC-based building information modelling and extraction for supporting value analysis of buildings
    Zhang, Lu
    El-Gohary, Nora M.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (04) : 269 - 288
  • [10] Towards automated construction progress monitoring using BIM-based point cloud processing
    Braun, A.
    Borrmann, A.
    Tuttas, S.
    Stilla, U.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION 2014, 2015, : 101 - 107