Demolition waste for adsorption of metals: A step towards the circular economy

被引:1
|
作者
Vallini, Juan [1 ]
Willson, Victoria [1 ]
Luco, Luis Fernandez [2 ]
Saralegui, Andrea B. [1 ]
Boeykens, Susana P. [1 ]
Piol, M. Natalia [1 ]
机构
[1] Univ Buenos Aires, Fac Ingn, Lab Quim Sistemas Heterogeneos LaQuiSiHe, IQAI, Buenos Aires, DF, Argentina
[2] Univ Buenos Aires, Fac Ingn, Lab Mat & Estruct LaME, Buenos Aires, DF, Argentina
关键词
Adsorbent; Demolition waste reuse; Metal adsorption; Industrial wastewater treatment; BED;
D O I
10.1016/j.jenvman.2023.118200
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The proposal of effluent treatment systems, based on circular economy principles, is a great challenge that leads to the reduction of waste from other activities, thus reducing the environmental and economic cost of the global process. In this work, buildings demolition waste is proposed to be used for metals removal from industrial effluents. To validate these hypotheses, tests were carried out on batch reactors using Copper, Nickel, and Zinc solutions, in concentrations between 8 and 16 mM. As results, removals greater than 90% were obtained. With these preliminary outcomes, it was decided to use equimolar multicomponent solutions with 8 and 16 mM of these metals in a column packed with demolition waste as adsorbent. From the breakthrough curves, it was observed that the adsorption occurs in the order Copper > Nickel > Zinc. The columns' saturated filler could be safely disposed of by incorporating it into conventional or special mortars and concrete. Preliminary studies on the leaching and resistance of mortars prepared with exhausted adsorbents are also promising. It is concluded that these materials emerge as an economic and sustainable alternative for metal contaminants removal.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Transformation towards a circular economy in the Australian construction and demolition waste management system
    Shooshtarian, Salman
    Maqsood, Tayyab
    Caldera, Savindi
    Ryley, Tim
    SUSTAINABLE PRODUCTION AND CONSUMPTION, 2022, 30 : 89 - 106
  • [2] Towards a circular economy for construction and demolition waste management in China: Critical success factors
    Ma, Wenting
    Liu, Tian
    Li Hao, Jian
    Wu, Weiwei
    Gu, Xierong
    SUSTAINABLE CHEMISTRY AND PHARMACY, 2023, 35
  • [3] Role of Sound Construction and demolition Waste Management in Circular Economy
    Engelsen, Christian J.
    Kumar Ghosh, Sadhan
    Journal of Solid Waste Technology and Management, 2024, 50 (02):
  • [4] The Recycling of Construction and Demolition Waste from a Circular Economy Perspective
    Wu, Zhenqiang
    Wang, Luqi
    Ye, Qizhi
    Feng, Weimin
    CARBON PEAK AND NEUTRALITY STRATEGIES OF THE CONSTRUCTION INDUSTRY (ICCREM 2022), 2022, : 236 - 243
  • [5] Construction and demolition waste management and circular economy: a narrative review
    Oviedo-Cogollo, Amauri Rafael
    Vega-Sanchez, Julio Cesar
    REVISTA DIGITAL LAMPSAKOS, 2021, (26): : 41 - 51
  • [6] Do hazardous substances in demolition waste hinder circular economy?
    Ahkola, Heidi
    Junttila, Ville
    Kauppi, Sari
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2024, 364
  • [7] Construction and demolition waste framework of circular economy: A mini review
    Papamichael, Iliana
    Voukkali, Irene
    Loizia, Pantelitsa
    Zorpas, Antonis A.
    WASTE MANAGEMENT & RESEARCH, 2023, 41 (12) : 1728 - 1740
  • [8] Deep learning model for Demolition Waste Prediction in a circular economy
    Akanbi, Lukman A.
    Oyedele, Ahmed O.
    Oyedele, Lukumon O.
    Salami, Rafiu O.
    JOURNAL OF CLEANER PRODUCTION, 2020, 274
  • [9] Circular Economy of Construction and Demolition Waste: A Case Study of Colombia
    Colorado, Henry A.
    Munoz, Andrea
    Monteiro, Sergio Neves
    SUSTAINABILITY, 2022, 14 (12)
  • [10] Barriers to circular economy practices during construction and demolition waste management in an emerging economy
    Bhavsar, Vandana
    Sridharan, Srividhya Raju
    Sudarsan, J. S.
    RESOURCES CONSERVATION & RECYCLING ADVANCES, 2023, 20