Risk Assessment Method of Power Communication Network Based on Gray Cloud Theory and Matter-Element Extension Model Coupling

被引:0
|
作者
Chen, Xiaojuan [1 ]
Xu, Linlin [1 ]
Li, Xue [1 ]
Cong, Li [2 ]
机构
[1] Changchun Univ Sci & Technol, Coll Elect Informat Engn, Changchun 130000, Peoples R China
[2] Informat & Commun Co State Grid Jilin Prov Elect C, Changchun 130000, Peoples R China
关键词
Gray cloud theory; matter-element extension model; triangular modulus operator; comprehensive risk assessment; SYSTEMS;
D O I
10.1109/ACCESS.2023.3346678
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
With the deepening of the integration of power system and communication network.The failure of the power communication network often leads to a cascading failure of the power system. Evaluating the potential risks in the power communication network is crucial to ensure the stable operation of the power system. This paper proposes a comprehensive risk assessment method for qualitative and quantitative measures. Firstly, an index system for risk assessment, considering both static structure and dynamic operation, is established. The optimal weight of each index is determined using the combination game weighting method. Additionally, a risk assessment model for the power communication network is established by coupling gray cloud theory and matter-element extension model. The fuzzy theory's triangular modulus operator is utilized to fuse three types of fault probabilities, quantify the risk value of the power communication network, and assign it a grade. Finally, experimental results demonstrate that this method improves discrimination degree by 1.2%, 92%, and 85% respectively compared to other traditional algorithms.
引用
收藏
页码:47581 / 47593
页数:13
相关论文
共 50 条
  • [1] Operation Health Assessment of Power Market Based on Improved Matter-Element Extension Cloud Model
    Dong, Jun
    Wang, Dongxue
    Liu, Dongran
    Ainiwaer, Palidan
    Nie, Linpeng
    [J]. SUSTAINABILITY, 2019, 11 (19)
  • [2] A Risk Assessment Model of Coalbed Methane Development Based on the Matter-Element Extension Method
    Wang, Wanqing
    Lyu, Shuran
    Zhang, Yudong
    Ma, Shuqi
    [J]. ENERGIES, 2019, 12 (20)
  • [3] Risk assessment of urban network planning in china based on the matter-element model and extension analysis
    He Yong-xiu
    Dai Ai-ying
    Zhu Jiang
    He Hai-ying
    Li Furong
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2011, 33 (03) : 775 - 782
  • [4] A Risk Assessment Method of Chemical Contaminants in Meat Products Based on Improved Matter-Element Extension Model
    Dou, Haifeng
    Chen, Yi
    Wu, Caixia
    Guo, Wei
    Zhang, Feng
    [J]. Shipin Kexue/Food Science, 2023, 44 (11): : 1 - 8
  • [5] A Novel Model for Potential Assessment of Technology Commercialization Based on Extension Matter-Element Theory
    Zhang, Ling
    Cui, Yi
    [J]. 2013 INTERNATIONAL CONFERENCE ON MANAGEMENT AND INFORMATION TECHNOLOGY, 2013, : 692 - 698
  • [6] Risk Assessment of Extended Reach Well based on Gray Matter-Element
    Zhang, Hui
    Gao, Deli
    Liu, Wensheng
    [J]. NATURAL RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-3, 2012, 361-363 : 386 - 392
  • [7] Mineral investment risk assessment of host countries based on a cloud matter-element model
    Hou, Jie
    Li, Guoqing
    Ling, Jiahong
    Chen, Lianyun
    Zhao, Wei
    Sheng, Baoli
    [J]. GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2023, 39 (04): : 23 - 48
  • [8] Research on Power Quality Evaluation Based on Matter-element Extension Model
    Wang, Yong-hua
    Luo, Guo-liang
    [J]. INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY II, PTS 1-4, 2013, 411-414 : 2735 - 2741
  • [9] Slope Stability Assessment Based on Fuzzy Matter-element Extension Model
    Liu, Jinfeng
    Ou, Guoqiang
    You, Yong
    [J]. PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 366 - 370
  • [10] The Establishment of EPC General Contractor Risk Evaluation Model Based on Extension Matter-Element Theory
    Chen, Weike
    Ge, Qingwei
    Yu, Peng
    [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3429 - 3436