共 50 条
- [1] Study on mechanism of reservoir valley width deformation during impoundment of Xiluodu arch dam Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2023, 42 (05): : 1083 - 1095
- [3] High Arch Dam Reservoir Basin Deformation & Effect on Dam Operating Status APPLIED MECHANICS, MATERIALS AND MANUFACTURING IV, 2014, 670-671 : 651 - 654
- [6] ANALYSIS OF THE EMBANKMENT DAM DEFORMATION DURING TAILING STORAGE RESERVOIR FILLING BULLETIN OF THE TOMSK POLYTECHNIC UNIVERSITY-GEO ASSETS ENGINEERING, 2021, 332 (06): : 178 - 185
- [8] Towards a Better Understanding of Concrete Arch Dam Behavior during the First Filling of the Reservoir CIVILENG, 2023, 4 (01): : 151 - 173
- [9] Coupled Thermo-Hydro-Mechanical Analysis of Valley Narrowing Deformation of High Arch Dam: A Case Study of the Xiluodu Project in China APPLIED SCIENCES-BASEL, 2020, 10 (02):