共 50 条
- [2] The risk assessment of bridge design based on the AHP-FCE model Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (SUPPL. 2): : 275 - 280
- [3] Risk assessment of bridge fire safety based on AHP-FCE method LIFE-CYCLE OF STRUCTURAL SYSTEMS: DESIGN, ASSESSMENT, MAINTENANCE AND MANAGEMENT, 2015, : 1945 - 1951
- [4] Risk Assessment of Government Purchased Pension Services Based on AHP-FCE PROCEEDINGS OF THE FIFTH INTERNATIONAL FORUM ON DECISION SCIENCES, 2018, : 111 - 123
- [5] Vulnerability Assessment for GNSS Constellation Based on AHP-FCE CHINA SATELLITE NAVIGATION CONFERENCE (CSNC) 2013 PROCEEDINGS: BEIDOU/GNSS NAVIGATION APPLICATIONS, TEST & ASSESSMENT TECHNOLOGY, USER TERMINAL TECHNOLOGY, 2013, : 281 - 291
- [6] The study of Green Risk Assessment for Construction Project Based on "AHP-FCE" Method PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 130 - 134
- [8] Research on Legal Risk Assessment in High-tech SMEs based on AHP-FCE Model 2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2019, : 828 - 831
- [9] Available target evaluation of underground gas storage based on AHP-FCE methods GEOENERGY SCIENCE AND ENGINEERING, 2024, 242
- [10] Metro Emergency Management Capacity Assessment Research Based on AHP-FCE Model PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1314 - 1317