A Novel Risk Assessment Model for Prefabricated Building Construction Based on Combination Weight and Catastrophe Progression Method

被引:3
|
作者
Lu, Wei [1 ]
Fang, Lei [2 ]
Ai, Le [3 ]
机构
[1] Univ Exeter, Sch Business, Stocker Rd, Exeter EX4 4PY, England
[2] Henan Univ Econ & Law, Sch Finance, 180 Jinshui East Rd, Zhengzhou 450046, Peoples R China
[3] Zhengzhou Univ Light Ind, 166 KeXue Rd, Zhengzhou 450000, Peoples R China
来源
TEHNICKI VJESNIK-TECHNICAL GAZETTE | 2023年 / 30卷 / 06期
关键词
AHP method; catastrophe progression method; construction risks; CRITIC method; prefabricated building; HIERARCHY PROCESS AHP; SAFETY; INCIDENTS; FUZZY;
D O I
10.17559/TV-20230802000846
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
To reduce the construction risk of prefabricated building projects, a prefabricated building construction risk assessment index system with five first-level indicators and 21 second-level indicators was established based on human, machine, material, management, and environmental factors. By combining the analytic hierarchy process (AHP), CRiteria Importance through Intercriteria Correlation (CRITIC), and catastrophe theory, a risk assessment model of prefabricated building construction based on a combination weighting and catastrophe progression method was constructed. The effectiveness of the assessment model using the combination weighting and catastrophe progression method was verified through case analysis. The results show the following: (1) The quality of the prefabricated components, the standardization degree of the prefabricated components, and the environment of the installation working space in the construction risk assessment indicators of prefabricated buildings obtained by the AHP-CRITIC weighting method have higher weights. (2) Four prefabricated construction enterprises under China State Construction Corporation are evaluated, and the evaluation results effectively evaluate the project risk situation before an accident occurred, achieving the goal of improving the risk management efficiency. (3) The AHPCRITIC weighting method can reflect the fuzziness of the construction risk of the evaluated project, effectively reduce information loss, and thus make the evaluation results more accurate. The conclusions have important practical significance for improving the construction risk management of prefabricated buildings.
引用
收藏
页码:1959 / 1967
页数:9
相关论文
共 50 条
  • [1] Risk assessment of construction safety of prefabricated building hoisting based on cloud model-entropy method
    Fang, Chengkuan
    Zhong, Chunling
    Zhang, Yunlong
    [J]. INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2022, 70 (3-4) : 233 - 243
  • [2] Research on safety risk assessment model of prefabricated concrete building construction
    Guo, Jianfei
    [J]. INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2022, 18 (03) : 197 - 210
  • [3] Rockburst risk assessment model based on improved catastrophe progression method and its application
    Xing, Wenbin
    Wang, Hanpeng
    Fan, Jianguo
    Wang, Wei
    Yu, Xinping
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2024, 38 (03) : 981 - 992
  • [4] Rockburst risk assessment model based on improved catastrophe progression method and its application
    Wenbin Xing
    Hanpeng Wang
    Jianguo Fan
    Wei Wang
    Xinping Yu
    [J]. Stochastic Environmental Research and Risk Assessment, 2024, 38 : 981 - 992
  • [5] Risk assessment of glacial lake outburst based on catastrophe progression assessment method
    Construction College Jilin University, Changchun, China
    [J]. Intl. J. Earth Sci. Eng., 5 (2326-2332):
  • [6] Risk assessment of prefabricated buildings based on combination weighting and interval approximation construction
    Liao, Junwen
    Jiang, Xianyong
    Liu, Jingshuo
    [J]. Journal of Railway Science and Engineering, 2024, 21 (10) : 4311 - 4320
  • [7] Construction and application of risk assessment model for prefabricated construction quality
    Chen, Rongfang
    Jiang, Anmin
    Dong, Yanchen
    Xiong, Qiwei
    Lu, Yinrui
    [J]. Journal of Railway Science and Engineering, 2021, 18 (10) : 2788 - 2796
  • [8] Cloud Model-Based Intelligent Construction Management Level Assessment of Prefabricated Building Projects
    An, Hongda
    Jiang, Lei
    Chen, Xingwen
    Gao, Yunli
    Wang, Qingchun
    [J]. Buildings, 2024, 14 (10)
  • [9] Regionalization of Green Building Development in China: A Comprehensive Evaluation Model Based on the Catastrophe Progression Method
    Chen, Linyan
    Gao, Xin
    Gong, Shitao
    Li, Zhou
    [J]. SUSTAINABILITY, 2020, 12 (15)
  • [10] On Risk Probability of Prefabricated Building Hoisting Construction Based on Multiple Correlations
    Wan, Peng
    Wang, Junwu
    Liu, Ye
    Lu, Qizhi
    Yuan, Chunbao
    [J]. SUSTAINABILITY, 2022, 14 (08)