As built design of the control systems of the ITER full-size beam source SPIDER in the neutral beam test facility- A critical review

被引:1
|
作者
Luchetta, A. [1 ,2 ]
Taliercio, C. [1 ,2 ]
Cruz, N. [1 ,3 ]
Martini, G. [1 ]
Manduchi, G. [1 ,2 ]
Rigoni, A. [1 ]
Trevisan, L. [1 ]
Paolucci, F. [4 ]
Labate, C. [4 ]
Breda, M. [1 ]
Capobianco, R. [1 ,2 ]
Moressa, M. [1 ,2 ]
Molon, F. [1 ]
Sartore, A. [1 ]
Simionato, P. [1 ,2 ]
Zampiva, E. [1 ,2 ]
Barbato, P. [1 ,2 ]
Carraro, M. [1 ,2 ]
Migliorato, L. [1 ]
机构
[1] Univ Padua, Consorzio RFX, CNR, ENEA,Ist Nazl Fis Nucl,Acc Venete, Corso Stati Uniti 4, I-35127 Padua, Italy
[2] Ist Sci & Tecnol Plasmi, CNR, Padua, Italy
[3] Univ Lisbon, Inst Plasmas & Fusao Nucl, Inst Super Tecn, P-1049001 Lisbon, Portugal
[4] Fus Energy, C Josep Pla,2 Torres Diagonal Litoral,Edificio B3, Barcelona 08019, Spain
关键词
ITER; Neutral beam test facility; Heating neutral beam injectors; SPIDER; I&C systems; As-built design;
D O I
10.1016/j.fusengdes.2023.113624
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
SPIDER, ITER's full-size beam source at the Neutral Beam Test Facility (NBTF), has been operational since 2018. SPIDER's mission is to optimize the operation of the beam source in order to reuse SPIDER's experience on MITICA, the full-size prototype of the ITER Neutral Beam Injector, and in the ITER injectors.The exploitation of SPIDER started with short, low-performance pulses lasting up to a few seconds and pro-gressed to obtain long pulses up to 3000 seconds. Furthermore, the integration of plant and diagnostic systems has grown over time. The amount of data collected per pulse provide a measure of evolution: it has gone from a few tens of MB in the first campaign pulses to the current average value of over 130 GB, most of which produced by infrared and visible cameras. From the first operation onwards, the control systems have also evolved, including components and functions initially not foreseen or developed in a preliminary form. This includes the progressive integration of plant and diagnostic systems and of protection and safety functions.The paper initially focuses on the architecture of the SPIDER control systems, i.e. CODAS, the system deliv-ering conventional control and data management, the central interlock system, delivering plant protection, and the central safety system delivering people and environment safety. Since we developed all systems according to the ITER guidelines for implementing control systems, the integrated SPIDER control, interlock and safety sys-tems may provide an interesting example for developers of ITER plant systems. The paper then describes how the top-down definition and implementation of operating states and operational scenarios provides the framework for the integration of control, interlock and safety systems and the basic elements for successful operation. Finally, the paper reports the lessons learned during these years of operation with particular attention to the progressive, continuous evolution and recommissioning of systems.
引用
收藏
页数:10
相关论文
共 23 条
  • [1] Manufacturing of the full size prototype of the ion source for the ITER neutral beam injector - The SPIDER beam source
    Pavei, Mauro
    Boilson, Deirdre
    Bonicelli, Tullio
    Boury, Jacques
    Bush, Michael
    Ceracchi, Andrea
    Faso, Diego
    Graceffa, Joseph
    Heinemann, Bernd
    Hemsworth, Ronald
    Lievin, Christophe
    Marcuzzi, Diego
    Masiello, Antonio
    Sczepaniak, Bernd
    Singh, Mahendrajit
    Toigo, Vanni
    Zaccaria, Pierluigi
    FUSION ENGINEERING AND DESIGN, 2015, 96-97 : 319 - 324
  • [2] Design of the "half-size" ITER neutral beam source for the test facility ELISE
    Heinemann, B.
    Falter, H.
    Fantza, U.
    Franzen, R.
    Froeschle, M.
    Gutser, R.
    Kraus, W.
    Nocentini, R.
    Riedl, R.
    Speth, E.
    Staebler, A.
    Wuenderlich, D.
    Agostinetti, P.
    Jiang, T.
    FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) : 915 - 922
  • [3] The ITER Neutral Beam Test Facility towards SPIDER operation
    Toigo, V.
    Dal Bello, S.
    Gaio, E.
    Luchetta, A.
    Pasqualotto, R.
    Zaccaria, P.
    Bigi, M.
    Chitarin, G.
    Marcuzzi, D.
    Pomaro, N.
    Serianni, G.
    Agostinetti, P.
    Agostini, M.
    Antoni, V.
    Aprile, D.
    Baltador, C.
    Barbisan, M.
    Battistella, M.
    Boldrin, M.
    Brombin, M.
    Dalla Palma, M.
    De Lorenzi, A.
    Delogu, R.
    De Muri, M.
    Fellin, F.
    Ferro, A.
    Gambetta, G.
    Grando, L.
    Jain, P.
    Maistrello, A.
    Manduchi, G.
    Marconato, N.
    Pavei, M.
    Peruzzo, S.
    Pilan, N.
    Pimazzoni, A.
    Piovan, R.
    Recchia, M.
    Rizzolo, A.
    Sartori, E.
    Siragusa, M.
    Spada, E.
    Spagnolo, S.
    Spolaore, M.
    Taliercio, C.
    Valente, M.
    Veltri, P.
    Zamengo, A.
    Zaniol, B.
    Zanotto, L.
    NUCLEAR FUSION, 2017, 57 (08)
  • [4] Control and data acquisition of the ITER full-scale ion source for the neutral beam test facility
    Luchetta, Adriano
    Manduchi, Gabriele
    Taliercio, Cesare
    Paolucci, Francesco
    Sartori, Filippo
    Svensson, Lennart
    Labate, Carmelo Vincenzo
    Breda, Mauro
    Capobianco, Roberto
    Molon, Federico
    Moressa, Modesto
    Simionato, Paola
    Zampiva, Enrico
    Barbato, Paolo
    Polato, Sandro
    FUSION ENGINEERING AND DESIGN, 2015, 96-97 : 512 - 516
  • [5] Safety systems in the ITER neutral beam test facility
    Dal Bello, Samuele
    Battistella, Manuela
    Grando, Luca
    Luchetta, Adriano
    Moressa, Modesto
    Breda, Mauro
    Svensson, Lennart
    Paolucci, Francesco
    Labate, Carmelo Vincenzo
    FUSION ENGINEERING AND DESIGN, 2019, 146 : 246 - 249
  • [6] THE CRYOPLANT FOR THE ITER NEUTRAL BEAM TEST FACILITY TO BE BUILT AT RFX IN PADOVA, ITALY
    Pengo, R.
    Fellin, F.
    Sonato, P.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 55A AND 55B, 2010, 1218 : 663 - +
  • [7] The PRIMA Test Facility: SPIDER and MITICA test-beds for ITER neutral beam injectors
    Toigo, V.
    Piovan, R.
    Dal Bello, S.
    Gaio, E.
    Luchetta, A.
    Pasqualotto, R.
    Zaccaria, P.
    Bigi, M.
    Chitarin, G.
    Marcuzzi, D.
    Pomaro, N.
    Serianni, G.
    Agostinetti, P.
    Agostini, M.
    Antoni, V.
    Aprile, D.
    Baltador, C.
    Barbisan, M.
    Battistella, M.
    Boldrin, M.
    Brombin, M.
    Dalla Palma, M.
    De Lorenzi, A.
    Delogu, R.
    De Muri, M.
    Fellin, F.
    Ferro, A.
    Fiorentin, A.
    Gambetta, G.
    Gnesotto, F.
    Grando, L.
    Jain, P.
    Maistrello, A.
    Manduchi, G.
    Marconato, N.
    Moresco, M.
    Ocello, E.
    Pavei, M.
    Peruzzo, S.
    Pilan, N.
    Pimazzoni, A.
    Recchia, M.
    Rizzolo, A.
    Rostagni, G.
    Sartori, E.
    Siragusa, M.
    Sonato, P.
    Sottocornola, A.
    Spada, E.
    Spagnolo, S.
    NEW JOURNAL OF PHYSICS, 2017, 19
  • [8] Prototyping Control and Data Acquisition for the ITER Neutral Beam Test Facility
    Luchetta, Adriano
    Manduchi, Gabriele
    Taliercio, Cesare
    Soppelsa, Anton
    Paolucci, Francesco
    Sartori, Filippo
    Barbato, Paolo
    Breda, Mauro
    Capobianco, Roberto
    Molon, Federico
    Moressa, Modesto
    Polato, Sandro
    Simionato, Paola
    Zampiva, Enrico
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 2013, 60 (05) : 3454 - 3460
  • [9] Prototyping Control and Data Acquisition for the ITER Neutral Beam Test Facility
    Luchetta, Adriano
    Manduchi, Gabriele
    Taliercio, Cesare
    Soppelsa, Anton
    Paolucci, Francesco
    Sartori, Filippo
    Barbato, Paolo
    Capobianco, Roberto
    Breda, Mauro
    Molon, Federico
    Moressa, Modesto
    Polato, Sandro
    Simionato, Paola
    Zampiva, Enrico
    2012 18TH IEEE-NPSS REAL TIME CONFERENCE (RT), 2012,
  • [10] Progress in control and data acquisition for the ITER neutral beam test facility
    Luchetta, Adriano
    Manduchi, Gabriele
    Taliercio, Cesare
    Soppelsa, Anton
    Paolucci, Francesco
    Sartori, Filippo
    Barbato, Paolo
    Capobianco, Roberto
    Breda, Mauro
    Molon, Federico
    Moressa, Modesto
    Polato, Sandro
    Simionato, Paola
    Zampiva, Enrico
    FUSION ENGINEERING AND DESIGN, 2013, 88 (6-8) : 492 - 496