Improved methodology for solving short-term inadequacy

被引:0
|
作者
Presic, Andrijana [1 ]
Presic, Dusan [1 ]
Gomez, Pablo Bort [2 ]
机构
[1] SCC Ltd, Dev Dept, Belgrade, Serbia
[2] ETRA I D, Technol Dept, Valencia, Spain
关键词
Inadequacy; Optimization; Regional; Transactions;
D O I
10.1109/POWERTECH55446.2023.10202732
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Short-Term Adequacy (STA) is one of services that are performed by Regional Coordination Centres/Regional Security Coordinators. STA service consists of two processes: cross-regional STA and Regional Adequacy Assessment (RAA). Cross-regional STA process is performed with the goal to determine if the reliable available capacity and possibilities for import of control areas can supply the demand of those control areas (this process is done on pan-European level). If adequacy is not satisfied for some control area based on the outcome of cross-regional STA process, RAA should be performed with the goal of solving inadequacy within corresponding region [1]. Methodology for solving inadequacy in South East Europe region is developed within Horizon 2020 project CROSSBOW [2]. This methodology consists of two parts: calculation of probabilistic adequacy indicators and determination of optimal adequacy transactions that solve detected inadequacy. Second part of the given methodology is improved within Horizon 2020 project TRINITY and this improved algorithm for determination of optimal adequacy transactions is presented in this paper, with the special focus on the differences between CROSSBOW and TRINITY results.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] AN IMPROVED METHODOLOGY FOR SHORT-TERM OPERATION OF A SINGLE MULTIPURPOSE RESERVOIR
    SIMONOVIC, SP
    BURN, DH
    [J]. WATER RESOURCES RESEARCH, 1989, 25 (01) : 1 - 8
  • [2] METHODOLOGY IN SHORT-TERM THERAPY
    WOLBERG, L
    [J]. AMERICAN JOURNAL OF PSYCHIATRY, 1965, 122 (02): : 135 - 140
  • [3] A Methodology for Short-Term Load Forecasting
    [J]. Quintero, C.G. (christianq@uninorte.edu.co), 2017, IEEE Computer Society (15):
  • [4] A Methodology for Short-Term Load Forecasting
    Jimenez, J.
    Donado, K.
    Quintero, C. G.
    [J]. IEEE LATIN AMERICA TRANSACTIONS, 2017, 15 (03) : 400 - 407
  • [5] Hybrid Methodology for Short-Term Load
    Ray, Papia
    Sen, Santanu
    Barisal, A. K.
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON POWER ELECTRONICS, DRIVES AND ENERGY SYSTEMS (PEDES), 2014,
  • [6] INADEQUACY OF SHORT-TERM ELECTROENCEPHALOGRAM RECORDINGS IN NEONATES WITH CLINICALLY SUSPECTED SEIZURES
    GLAUSER, TA
    CLANCY, RR
    [J]. ANNALS OF NEUROLOGY, 1990, 28 (03) : 470 - 470
  • [7] Short-Term Methodology for Long-Term Usability
    Novick, David G.
    Santaella, Baltazar
    Cervantes, Aaron
    Andrade, Carlos
    [J]. SIGDOC '12: PROCEEDINGS OF THE 30TH ACM INTERNATIONAL CONFERENCE ON DESIGN OF COMMUNICATION, 2012, : 205 - 211
  • [8] An improved gravitational search algorithm for solving short-term economic/environmental hydrothermal scheduling
    Hao Tian
    Xiaohui Yuan
    Yuehua Huang
    Xiaotao Wu
    [J]. Soft Computing, 2015, 19 : 2783 - 2797
  • [9] SHORT-TERM, INTENSIVE WORKSHOP APPROACH FOR TREATMENT OF HUMAN SEXUAL INADEQUACY
    BLAKENEY, P
    KINDER, BN
    CRESON, D
    POWELL, LC
    SUTTON, C
    [J]. JOURNAL OF SEX & MARITAL THERAPY, 1976, 2 (02) : 124 - 129
  • [10] An improved gravitational search algorithm for solving short-term economic/environmental hydrothermal scheduling
    Tian, Hao
    Yuan, Xiaohui
    Huang, Yuehua
    Wu, Xiaotao
    [J]. SOFT COMPUTING, 2015, 19 (10) : 2783 - 2797