Labor waste in housing construction projects: an empirical study

被引:4
|
作者
Nassri, Soraya [1 ]
Talebi, Saeed [2 ]
Elghaish, Faris [3 ]
Koohestani, Kayvan [4 ]
McIlwaine, Stephen [3 ]
Hosseini, M. Reza [5 ]
Poshdar, Mani [4 ]
Kagioglou, Michail [6 ]
机构
[1] Shahid Beheshti Univ, Architecture & Urban Fac, Dept Construct, Terhran, Iran
[2] Birmingham City Univ, Sch Engn & Built Environm, Birmingham, W Midlands, England
[3] Queens Univ Belfast, Sch Nat & Built Environm, Belfast, Antrim, North Ireland
[4] Auckland Univ Technol, Auckland, New Zealand
[5] Deakin Univ, Fac Sci Engn & Built Environm, Geelong, Vic, Australia
[6] Western Sydney Univ, Sch Engn Design & Built Environm, Sydney, NSW, Australia
关键词
Labor productivity; Labor waste; Waste measurement; Waste identification; Lean construction; Work sampling; PRODUCTIVITY; WORK; MODEL;
D O I
10.1108/SASBE-07-2021-0108
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Purpose High-level labor waste is a major challenge in construction projects. This paper aims to identify, quantify and categorize labor waste in the context of Iranian housing construction projects. Design/methodology/approach This research uses a case study approach, with empirical data collected through direct observations and semi-structured interviews. Findings Having triangulated the findings from the literature review and empirical studies, a list of eight types of waste was derived for the thirteen observed laborers in ten case study projects. The empirical studies allowed the labor waste identified from the literature to be verified and refined by considering it in the context of the observed activities, and led to two new types of waste being identified which were not considered in the literature. Findings indicate that nearly 62% of laborers' time is spent on non-value-adding activities. It appeared that "unnecessary movement," "waiting" and "indirect work" make up the highest labor waste. Research limitations/implications This research focuses only on onsite resource flows in a housing construction site. It does not include offsite flows such as material delivery to site. Originality/value The findings have provided substantial evidence on type and amount of labor waste and provide a solid basis to stimulate construction actors to participate in reducing labor waste and improving productivity.
引用
收藏
页码:325 / 340
页数:16
相关论文
共 50 条
  • [1] An empirical study on waste generation rates at different stages of construction projects in China
    Wang, Qiankun
    Chen, Lei
    Hu, Ruibo
    Ren, Zhigang
    He, Yanting
    Liu, Daoru
    Zhou, Ziqi
    [J]. WASTE MANAGEMENT & RESEARCH, 2020, 38 (04) : 433 - 443
  • [2] Empirical Study to Determine Fragmentation of Construction Projects
    Alashwal, Ali Mohammed
    Fong, Patrick Sik-Wah
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (07)
  • [3] An empirical study on stakeholder management in construction projects
    Srinivasan, N. P.
    Dhivya, S.
    [J]. MATERIALS TODAY-PROCEEDINGS, 2020, 21 : 60 - 62
  • [4] Waste Management in housing construction projects in Costa Rica: theory versus practice
    Cruz-Zuniga, Nidia
    [J]. TECNOLOGIA EN MARCHA, 2023, 36
  • [5] Empirical Study upon Management Collaboration in Construction Projects
    Zhen, Zhilu
    Jian, Jianru
    Zhang, Yanbin
    [J]. CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1647 - +
  • [6] Evaluating Social Performance of Construction Projects: An Empirical Study
    Xiahou, Xiaer
    Tang, Yuchun
    Yuan, Jingfeng
    Chang, Tengyuan
    Liu, Ping
    Li, Qiming
    [J]. SUSTAINABILITY, 2018, 10 (07)
  • [7] An empirical study of the complexity of requirements management in construction projects
    Jallow, Abdou
    Demian, Peter
    Baldwin, Andrew
    Anumba, Chimay
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (05) : 505 - +
  • [8] THE EFFECTS OF DELAYS IN ALGERIAN CONSTRUCTION PROJECTS: AN EMPIRICAL STUDY
    Salhi, Roumeissa
    Messaoudi, Karima
    [J]. CIVIL AND ENVIRONMENTAL ENGINEERING REPORTS, 2021, 31 (02) : 218 - 254
  • [9] Empirical study of schedule delay in Moroccan construction projects
    Bajjou, Mohamed Saad
    Chafi, Anas
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (07) : 783 - 800
  • [10] The empirical reality of project management failures in the construction of social housing projects in South Africa
    Amoah, Christopher
    Kajimo-Shakantu, Kahilu
    van Schalkwyk, Tanya
    [J]. JOURNAL OF FACILITIES MANAGEMENT, 2020, 18 (04) : 417 - 435