Pilot-Plant Production of Titanosilicate Sorbents

被引:0
|
作者
Gerasimova, L. G. [1 ]
Nikolaev, A. I. [2 ]
Artemenkov, A. G. [1 ]
Shchukina, E. S. [1 ]
Maslova, M. V. [1 ]
Kiselev, Yu. G. [2 ]
机构
[1] Russian Acad Sci, Kola Sci Ctr, Tananaev Inst Chem & Technol Rare Elements & Miner, Fed Res Ctr, Apatity 184209, Murmansk Oblast, Russia
[2] Russian Acad Sci, Ctr Nanomat Sci, Kola Sci Ctr, Fed Res Ctr, Apatity 184209, Russia
关键词
titanium salts; sorbents; titanosilicates; hydrothermal synthesis; sorption capacity; MICROPOROUS TITANOSILICATES; CRYSTAL-CHEMISTRY; ION-EXCHANGE;
D O I
10.1134/S0040579523050093
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Pilot-plant testing of a laboratory technology for producing alkaline titanosilicate sorbent from the current titanium-containing technogenic waste from the enrichment of the Khibiny apatite-nepheline ore shows that this technology can be modeled on an enlarged (pilot-plant) scale. The parameters of the main technological operations in systems of various salt compositions are checked and optimized. For example, in the ammonium sulfate systems, a two-phase precipitate is formed, which consists of phases similar to the minerals zorite and ivanyukite at their weight ratio of about 1 : 0.8-1.0. A one-phase precipitate in the form of ivanukite crystals is formed in the sulfate system. A study of the technical and sorption properties characterized in the tests of sorbents finds that the absorption of the Cs+ cation is due to the substitution for the Na+ cation in the interframework space of the crystal. The Sr2+ cation is also substituted for Na+ and is additionally deposited on the sorbent particles due to the alkaline reaction of its surface. The sorption capacities of powder and granules for Sr2+ are, on average, 170 and 160 mg g(-1), respectively; and for Cs+, 275 and 245 mg g(-1), respectively. Tests will be continued as pilot batches of the sorbent with stable structure and properties are produced for testing in specialized organizations.
引用
收藏
页码:1066 / 1072
页数:7
相关论文
共 50 条
  • [1] Pilot-Plant Production of Titanosilicate Sorbents
    L. G. Gerasimova
    A. I. Nikolaev
    A. G. Artemenkov
    E. S. Shchukina
    M. V. Maslova
    Yu. G. Kiselev
    Theoretical Foundations of Chemical Engineering, 2023, 57 : 1066 - 1072
  • [2] PILOT-PLANT PRODUCTION
    SCOTT, WC
    PATTERSON, GG
    ELDER, HW
    INDUSTRIAL AND ENGINEERING CHEMISTRY, 1961, 53 (09): : 713 - 716
  • [3] PILOT-PLANT PRODUCTION OF OPTICAL FIBERS
    PEELEN, JGJ
    VERSLUIS, JW
    ACTA ELECTRONICA, 1979, 22 (03): : 255 - 260
  • [4] PRODUCTION OF AUTOCLAVED PELLETS AT A PILOT-PLANT
    LOTOSH, VE
    FATIKHOV, VF
    KOMLEV, AM
    NAIDENOV, VA
    CHESNOKOV, AA
    METALLURGIST, 1983, 27 (3-4) : 115 - 119
  • [5] PILOT-PLANT PRODUCTION OF ELECTROLYTIC CHROMIUM
    LLOYD, RR
    ROSENBAUM, JB
    HOMME, VE
    DAVIS, LP
    JOURNAL OF THE ELECTROCHEMICAL SOCIETY, 1948, 94 (03) : 122 - 138
  • [6] PILOT-PLANT PRODUCTION OF NIOBIUM METAL
    NARAYANAN, C
    MUKHERJEE, TK
    BOSE, DK
    GUPTA, CK
    TRANSACTIONS OF THE INDIAN INSTITUTE OF METALS, 1977, 30 (06): : 387 - &
  • [7] PRODUCTION OF MALLEABLE ZIRCONIUM ON A PILOT-PLANT SCALE
    KROLL, WJ
    STEPHENS, WW
    HOLMES, HP
    JOURNAL OF METALS, 1950, 2 (12): : 1445 - 1453
  • [8] PILOT-PLANT PRODUCTION OF GROUND SERRATIA MARCESCENS
    PFEIFER, VF
    VOJNOVICH, C
    MAISTER, HG
    SOHNS, VE
    HEGER, EN
    BOGART, WM
    INDUSTRIAL AND ENGINEERING CHEMISTRY, 1958, 50 (08): : 1143 - 1148
  • [9] PRODUCTION OF MALLEABLE ZIRCONIUM ON A PILOT-PLANT SCALE
    KROLL, WJ
    STEPHENS, WW
    HOLMES, HP
    TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1950, 188 (12): : 1445 - 1453
  • [10] A PILOT-PLANT PROCESS FOR PRODUCTION OF DEHYDRATED TEMPEH
    STEINKRAUS, KH
    VANBUREN, JP
    HACKLER, LR
    HAND, DB
    FOOD TECHNOLOGY, 1965, 19 (01) : 63 - +