Whole Life Cycle Cost Analysis of Transmission Lines Using the Economic Life Interval Method

被引:3
|
作者
Zeng, Wenhui [1 ]
Fan, Jiayuan [2 ]
Zhang, Wentao [1 ]
Li, Yu [1 ]
Zou, Bin [1 ]
Huang, Ruirui [3 ]
Xu, Xiao [3 ]
Liu, Junyong [3 ]
机构
[1] State Grid Sichuan Econ Res Inst, Chengdu 610095, Peoples R China
[2] State Grid Sichuan Informat & Commun Co, Chengdu 610041, Peoples R China
[3] Sichuan Univ, Coll Elect Engn, Chengdu 610065, Peoples R China
关键词
transmission line; economic life; interval cost; gray forecasting model;
D O I
10.3390/en16237804
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
With the large-scale construction and commissioning of transmission lines over the past two decades, the grid is facing a large-scale centralized decommissioning of transmission lines. The transmission line's economic life is crucial to rationalizing its construction and reducing the grid's development costs. Based on the minimum economic life calculation principle, the static and dynamic transmission line economic life calculation model is established, considering the whole life cycle for transmission line cost. The improved gray GM (1,1) model is applied to forecast cost data during the economic life assessment of transmission lines with fewer samples. Considering the cost uncertainty in life-cycle costing, the interval cost model based on the coefficient of variation wave amplitude is proposed to determine the economic life intervals under different guarantees by using the normal distribution probability density function, which reduces the influence of cost fluctuations on the economic life calculation error. The economic life analysis of a 500 kV transmission line is used as a case study to verify the model's accuracy and effectiveness. The method shows the economic life intervals under different guarantee degrees based on the most probable economic life determination, which provides theoretical support for calculating the economic life elasticity of transmission lines.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Optimal economic life interval evaluation of transmission lines
    Xu, Wei
    Wang, Huifang
    Du, Zhendong
    Qiu, Jian
    Yao, Yan
    He, Benteng
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2015, 39 (12): : 74 - 80
  • [2] Life cycle cost sensitivity analysis in AC transmission lines design
    Liu, Jian
    Zhang, Yong
    Du, Zhi-Ye
    Ruan, Jiang-Jun
    Liu, Kai-Pei
    Gaodianya Jishu/High Voltage Engineering, 2010, 36 (06): : 1554 - 1559
  • [3] Comparative Economic Analysis of Transmission Lines Adopted for Energy-Saving Conductors Considering Life Cycle Cost
    Fan, Lanxin
    Chen, Heng
    Zhao, Shuyuan
    Wang, Yinan
    INVENTIONS, 2024, 9 (04)
  • [4] Determining Economic Life Cycle for Power Transformer Based on Life Cycle Cost Analysis
    Lee, Sung Hun
    Lee, An Kyu
    Kim, Jin O.
    PROCEEDINGS OF THE 2012 IEEE INTERNATIONAL POWER MODULATOR AND HIGH VOLTAGE CONFERENCE, 2012, : 604 - 607
  • [5] Risk-based Life Cycle Cost Analysis Method for Transmission Systems
    Pan, Weiwei
    Wu, Guowei
    Zhou, Hui
    Wang, Chong
    Hou, Yunhe
    2012 3RD IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES EUROPE (ISGT EUROPE), 2012,
  • [6] Life Cycle Cost Analysis of transmission and distribution systems
    Jeromin, Ingo
    Balzer, Gerd
    Backes, Juergen
    Huber, Richard
    2009 IEEE BUCHAREST POWERTECH, VOLS 1-5, 2009, : 2361 - +
  • [7] Transformer life cycle cost model based on interval analysis
    Jiang, Xiubo
    Wu, Wenxuan
    Chen, Xiangwei
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2011, 31 (09): : 50 - 53
  • [8] Economic Analysis of Power Transmission Lines using Interval Mathematics
    Teegala, Srinivasa Kishore
    Singal, Sunil Kumar
    JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2015, 10 (04) : 1471 - 1479
  • [9] Determining Economic Life of Earth Moving Equipment by Using Life Cycle Cost Analysis: Case Study
    Kheirkhah Sabet Ghadam, Pedram
    Ravanshadnia, Mehdi
    Ramezani, Saeed
    PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2012, : 119 - 124
  • [10] Analysis on Whole Life Cycle Cost Management of Highway Engineering
    Feng, Huihong
    Ding, Xiaoping
    Chen, Jingsi
    Chen, Yu
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 3907 - 3910