Probabilistic Forecasting-Based Reserve Determination Considering Multi-Temporal Uncertainty of Renewable Energy Generation

被引:7
|
作者
Xu, Yuqi [1 ]
Wan, Can [1 ]
Liu, Hui [2 ]
Zhao, Changfei [1 ]
Song, Yonghua [1 ,3 ]
机构
[1] Zhejiang Univ, Coll Elect Engn, Hangzhou 310027, Peoples R China
[2] Guangxi Univ, Sch Elect Engn, Nanning 530004, Peoples R China
[3] Univ Macau, State Key Lab Internet Things Smart City, Taipa, Macau, Peoples R China
基金
中国国家自然科学基金;
关键词
Reserve determination; probabilistic forecasting; multi-temporal uncertainty; regulating reserve; ramp capability reserve; Ito-process model; OPTIMAL POWER-FLOW;
D O I
10.1109/TPWRS.2023.3252720
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Operating reserve, among the most important ancillary services, is a powerful prescription for mitigating increasing uncertainty of renewable generation. Traditional reserve determination neglects uncertainty of renewable generation variations within the dispatch interval, which cannot guarantee sufficient reserve deliverability in real-time operation. This article proposes a probabilistic forecasting-based reserve determination method to efficiently deal with multi-temporal uncertainty of renewable energy in power systems. A novel probabilistic forecasting approach is proposed by integrating Dirichlet process Gaussian mixture model into bootstrap-based extreme learning machine. A unified uncertainty model is constructed for depicting both interval-averaged uncertainty and intra-interval uncertainty by combing the probabilistic forecasts and linearized Ito-process model. In current business practices of many independent system operators, the coordinated determination of two well-designed reserve products, including regulating reserve and ramp capability reserve, is formulated in a two-stage robust optimization framework. A Bernstein polynomial-based model reformulation approach is then employed to handle the existing heterogeneity in the sub-models of each stage. Consequently, the integrated reserve determination is embedded in a generic two-stage robust optimization problem, which can be efficiently solved by the adopted modified column-and-constraint generation method. Finally, numerical simulations are implemented to validate the effectiveness and profitability of the proposed approach.
引用
收藏
页码:1019 / 1031
页数:13
相关论文
共 50 条
  • [1] Capacity expansion model for multi-temporal energy storage in renewable energy base considering various transmission utilization rates
    Chen, Xiaoyuan
    Wang, Yuyang
    Wu, Zhaoyuan
    Zhou, Ming
    Yuan, Bo
    JOURNAL OF ENERGY STORAGE, 2024, 98
  • [2] Co-Optimization of Energy and Reserve Capacity Considering Renewable Energy Unit with Uncertainty
    Hassan, Muhammad Wajahat
    Rasheed, Muhammad Babar
    Javaid, Nadeem
    Nazar, Waseem
    Akmal, Muhammad
    ENERGIES, 2018, 11 (10)
  • [3] Chance-Constrained Peer-to-Peer Joint Energy and Reserve Market Considering Renewable Generation Uncertainty
    Guo, Zhenwei
    Pinson, Pierre
    Chen, Shibo
    Yang, Qinmin
    Yang, Zaiyue
    IEEE TRANSACTIONS ON SMART GRID, 2021, 12 (01) : 798 - 809
  • [4] Reserve Providing in Future Generation Systems Considering Renewable Energy Sources
    Drees, T.
    von Bracht, N.
    Moser, A.
    2014 11TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM), 2014,
  • [5] Optimal sizing and operation of microgrid considering renewable energy uncertainty based on scenario generation
    Hu, Dingding
    Fan, Yinchao
    Shao, Wenbin
    JOURNAL OF ENERGY STORAGE, 2025, 109
  • [6] Determination of variation uncertainty in runoff time series at multi-temporal scales
    Ye, Yan
    Zhang, Jinping
    Long, Xunjian
    Ma, Lihua
    Ye, Yong
    JOURNAL OF WATER AND CLIMATE CHANGE, 2021, 12 (05) : 2010 - 2025
  • [7] A peer-to-peer joint energy and reserve market considering renewable generation uncertainty: A generalized Nash equilibrium approach
    Chen, Xiupeng
    Wang, Lu
    Jiang, Yuning
    Wang, Jianxiao
    Energy Conversion and Economics, 2024, 5 (03): : 168 - 181
  • [8] Analysis of uncertainty in multi-temporal object-based classification
    Loew, Fabian
    Knoefel, Patrick
    Conrad, Christopher
    ISPRS JOURNAL OF PHOTOGRAMMETRY AND REMOTE SENSING, 2015, 105 : 91 - 106
  • [9] Power source flexibility evaluation considering renewable energy generation uncertainty
    Xiao, Dingyao
    Wang, Chengmin
    Zeng, Pingliang
    Sun, Weiqing
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2015, 35 (07): : 120 - 125
  • [10] Scenario Generation Method Considering the Uncertainty of Renewable Energy Generations Based on Generative Adversarial Networks
    Huo, Chao
    Peng, Cheng
    Hao, Zhiguo
    Rong, Xiuting
    Dong, Xuetao
    Yang, Songhao
    2024 3RD INTERNATIONAL CONFERENCE ON ENERGY AND ELECTRICAL POWER SYSTEMS, ICEEPS 2024, 2024, : 130 - 134