Synchronization of train timetables in an urban rail network: A bi-objective optimization approach

被引:12
|
作者
Yin, Jiateng [1 ,2 ]
Wang, Miao [1 ]
D'Ariano, Andrea [3 ]
Zhang, Jinlei [2 ]
Yang, Lixing [1 ,2 ]
机构
[1] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing 100044, Peoples R China
[2] Beijing Jiaotong Univ, Sch Syst Sci, Beijing 100044, Peoples R China
[3] Roma Tre Univ, Dept Civil Comp Sci & Aeronaut Technol Engn, Rome, Italy
基金
中国国家自然科学基金;
关键词
Urban rail transit; Timetable optimization; Transfer synchronization; Passenger waiting time; LARGE-NEIGHBORHOOD SEARCH; ROLLING STOCK CIRCULATION; VEHICLE-ROUTING PROBLEM; TIME-DEPENDENT DEMAND; PASSENGER DEMAND; WAITING TIME; COORDINATION; MODELS; LINE;
D O I
10.1016/j.tre.2023.103142
中图分类号
F [经济];
学科分类号
02 ;
摘要
As urban rail networks in big cities tend to expand, the synchronization of trains has become a key issue for improving the service quality of passengers because most urban rail transit systems in the world involve more than one connected line, and passengers must transfer between these lines. In contrast to most existing studies that focus on a single line, in this study, we focus on synchronized train timetable optimization in an urban rail transit network, considering the dynamic passenger demand with transfers as well as train loading capacity constraints. First, we propose a mixed-integer programming (MIP) formulation for the synchronization of training timetables, in which we consider the optimization of two objectives. The first objective is to minimize the total waiting time of passengers, involving arriving and transfer passengers. Our second objective is a synchronization quality indicator (SQI) with piecewise linear formulation, which we propose to evaluate the transfer convenience of passengers. Subsequently, we propose several linearization techniques to handle the nonlinear constraints in the MIP formulation, and we prove the tightness of our reformulations. To solve large-scale instances more efficiently, we also develop a hybrid adaptive large neighbor search algorithm that is compared with two benchmarks: the commercial solver CPLEX and a metaheuristic. Finally, we focus on a series of real-world instances based on historical data from the Beijing metro network. The results show that our algorithm outperforms both benchmarks, and the synchronized timetable generated by our approach reduces the average waiting time of passengers by 1.5% and improves the connection quality of the Beijing metro by 14.8%.
引用
收藏
页数:28
相关论文
共 50 条
  • [1] A bi-objective model with sequential search algorithm for optimizing network-wide train timetables
    Tian, Xiaopeng
    Niu, Huimin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 127 : 1259 - 1272
  • [2] A Bi-Objective Optimization Model for Coordinated Train Timetabling in Rail Transit Networks
    Wang, Miao
    Chen, Xing
    Yin, Jiateng
    Su, Shuai
    Andrea, D'Ariano
    Wang, Yihui
    Tang, Tao
    2021 IEEE INTELLIGENT TRANSPORTATION SYSTEMS CONFERENCE (ITSC), 2021, : 2350 - 2355
  • [3] Last Train Delay Management in Urban Rail Transit Network: Bi-objective MIP Model and Genetic Algorithm
    Wenkai Xu
    Peng Zhao
    Liqiao Ning
    KSCE Journal of Civil Engineering, 2018, 22 : 1436 - 1445
  • [4] Last Train Delay Management in Urban Rail Transit Network: Bi-objective MIP Model and Genetic Algorithm
    Xu, Wenkai
    Zhao, Peng
    Ning, Liqiao
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (04) : 1436 - 1445
  • [5] Bi-objective optimization of last-train timetabling with multimodal coordination in urban transportation
    Ning, Jia
    Peng, Qiyuan
    Zhu, Yongqiu
    Xing, Xinjie
    Nielsen, Otto Anker
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2023, 154
  • [6] BI-OBJECTIVE OPTIMIZATION MODELS FOR NETWORK INTERDICTION
    Chen, Yan
    Guo, Cheng
    Yu, Shenghan
    RAIRO-OPERATIONS RESEARCH, 2019, 53 (02) : 461 - 472
  • [7] A Bi-objective optimization model for the last train timetabling problem
    Ning, Jia
    Peng, Qiyuan
    Zhu, Yongqiu
    Jiang, Yu
    Nielsen, Otto Anker
    JOURNAL OF RAIL TRANSPORT PLANNING & MANAGEMENT, 2022, 23
  • [8] Bi-objective optimization of timetable and rolling stock schedule for an urban rail passenger and freight line
    Yao, Yu
    Li, Pei
    Mo, Pengli
    D'Ariano, Andrea
    Appolloni, Andrea
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194
  • [9] Integrated optimization of rolling stock allocation and train timetables for urban rail transit networks: A benders decomposition approach
    Yin, Jiateng
    Pu, Fan
    Yang, Lixing
    D'Ariano, Andrea
    Wang, Zhouhong
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2023, 176
  • [10] Network vulnerability assessment via bi-objective optimization with a fragmentation approach as proxy
    Yajure, Cesar
    Montilla, Darihelen
    Ramirez-Marquez, Jose Emmanuel
    Rocco S, Claudio M.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2013, 227 (06) : 576 - 585