Analysis and Design of Protection Device for Anchor Cable Pull-Out in High-Stress Roadways

被引:1
|
作者
Guo, Fuxin [1 ]
Tu, Min [1 ]
Dang, Jiaxin [1 ]
机构
[1] Anhui Univ Sci & Technol, Sch Min Engn, Huainan 232001, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 21期
基金
中国国家自然科学基金;
关键词
anchor cable; ejection; strain energy; protective devices of spring; BOLTS;
D O I
10.3390/app132112023
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
In regions with high-stress roadway stress, anchor cables frequently experience damage, leading to risky pull-outs and ejections. This study aimed to determine the dynamics of such incidents, refine protective devices, and validate their efficacy in enhancing safety. Drawing from an ejection accident in the 1632 (3) roadway of Pan San Mine, a combination of laboratory experiments, theoretical analysis, simulations, and field applications was utilized. The kinetic energy and speed of cable ejections were determined from single-axis tension test data. Based on these insights, a spring-based protection device was conceptualized. Subsequent experiments and simulations evaluated the energy absorption and deformation characteristics of these devices with different diameters. The results included the following: A cable, during ejection, moved at 48 m/s. Spring protective devices of 4 mm can absorb more energy than the 5 mm, but the anti-ejection effect is poor respectively. Increasing the device diameter improved its performance, especially in controlling spring deformation rate and preventing cable lock-ups. This devised protection mechanism showed promising results when implemented in the 1511 (1) roadway of Zhangji Mine.
引用
收藏
页数:18
相关论文
共 37 条
  • [1] Failure mechanism and constitutive relation for an anchorage segment of an anchor cable under pull-out loading
    Wang, S. R.
    Wang, Y. H.
    Gong, J.
    Wang, Z. L.
    Huang, Q. X.
    Kong, F. L.
    ACTA MECHANICA, 2020, 231 (08) : 3305 - 3317
  • [2] Experimental analysis of anchor bolt in concrete under the pull-out loading
    Hariyadi
    Munemoto, Satoru
    Sonoda, Yoshimi
    3RD INTERNATIONAL CONFERENCE ON SUSTAINABLE CIVIL ENGINEERING STRUCTURES AND CONSTRUCTION MATERIALS - SUSTAINABLE STRUCTURES FOR FUTURE GENERATIONS, 2017, 171 : 926 - 933
  • [3] Failure mechanism and constitutive relation for an anchorage segment of an anchor cable under pull-out loading
    S. R. Wang
    Y. H. Wang
    J. Gong
    Z. L. Wang
    Q. X. Huang
    F. L. Kong
    Acta Mechanica, 2020, 231 : 3305 - 3317
  • [4] Influence of high temperature heating on pull-out properties of mechanical anchor embedded in concrete
    Matsuzawa, Koichi
    Kitsutaka, Yoshinori
    Katta, Akihiko
    Journal of Structural and Construction Engineering, 2015, 80 (707): : 29 - 37
  • [5] Field pull-out test and behavior analysis of compression type rock anchor cables
    Lu Li
    Zhang Si-ping
    Zhang Yong-xing
    Hu Dai-wen
    Wu Shu-guang
    ROCK AND SOIL MECHANICS, 2010, 31 (08) : 2435 - +
  • [6] Analysis of pull-out capacity of plate anchor using upper bound limit method
    Yu, Sheng-Bing
    Huang, Mao-Song
    Yantu Lixue/Rock and Soil Mechanics, 2010, 31 (SUPPL. 2): : 160 - 163
  • [7] Analysis of pull-out capacity of plate anchor using upper bound limit method
    Yu Sheng-bing
    Huang Mao-song
    ROCK AND SOIL MECHANICS, 2010, 31 : 160 - 163
  • [8] Design and analysis of bottled flammulina velutipes pull-out testing
    Gao, Wenshuo
    Song, Weidong
    Wang, Mingyou
    Wang, Jiaoling
    Ding, Tianhang
    Wu, Jinji
    Shen, Cheng
    Song, Weidong (songwd@163.com), 2020, Asian Association for Agricultural Engineering (29): : 155 - 162
  • [9] Pull-out bearing capacity and torque of post-installed screw anchor with torque management device
    Hirai T.
    Higashiyama H.
    Nakatsuji K.
    Igarashi S.
    Nagame Y.
    Deguchi Y.
    Zairyo/Journal of the Society of Materials Science, Japan, 2018, 67 (10) : 904 - 910
  • [10] Finite element analysis of soil-structure interaction in soil anchor pull-out tests
    Seo, H. J.
    Pelecanos, L.
    NUMERICAL METHODS IN GEOTECHNICAL ENGINEERING IX, VOL 2, 2018, : 1439 - 1444