Post-warranty maintenance strategy selection using shape packages process

被引:4
|
作者
Karar, Ahmed Noaman [1 ]
Labib, Ashraf [2 ]
Jones, Dylan [3 ]
机构
[1] Univ Portsmouth, Portsmouth, England
[2] Univ Portsmouth, Dept Strategy & Business Syst, Portsmouth, England
[3] Univ Portsmouth, Sch Math & Phys, Portsmouth, England
关键词
Post; -warranty; Maintenance strategy; Analytical hierarchy process; Case study; PREVENTIVE MAINTENANCE; EXTENDED WARRANTY; 2-DIMENSIONAL WARRANTY; OPTIMIZATION; PRODUCTS;
D O I
10.1016/j.ijpe.2022.108702
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
It is fair to assume that selection of a post-warranty maintenance strategy is one of the main challenges the capital-good owners face; however, there is relatively little research done in this area. This paper aims to assist asset owners in selecting the equipment maintenance package at the warranty termination time; it proposes the shape package process (SPP), which represents a comprehensive process that facilitates the choice between multiple packages, considering the cost and risk associated with each package.The main novelty of this paper is introducing two new parameters to compare maintenance packages: the risk reduction factor (RRF) to assess the maintenance task effectiveness in reducing non-financial risk and the value-added indicator (VAI) to evaluate the task efficiency in reducing the financial risk. Additionally, the suggested process includes mapping the risk profile associated with each package, enabling a cost-cutting process where the tasks with less value and risk mitigation can be easily identified and eliminated.A case study then demonstrates the process flexibility in comparing different maintenance packages using the analytical hierarchy process (AHP); while presenting RRF and VAI at the task and package levels when imple-mented in a cooling water system to select the post-warranty maintenance package from an asset owner's perspective.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Optimal warranty option and post-warranty maintenance strategy under a warranty menu: from a consumer perspective
    Qiao, Peirui
    Luo, Ming
    Ma, Yizhong
    Jabbar, Abdul
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 62 (05) : 1586 - 1608
  • [2] Optimal Post-Warranty Maintenance Strategy For The Second-Hand Product
    Lim, Jae-Hak
    Kim, Dae Kyung
    Park, Dong Ho
    [J]. 2020 ASIA-PACIFIC INTERNATIONAL SYMPOSIUM ON ADVANCED RELIABILITY AND MAINTENANCE MODELING (APARM), 2020,
  • [3] Renewing warranty and preventive maintenance for products with failure penalty post-warranty
    Chen, Jih-An
    Chien, Yu-Hung
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2007, 23 (01) : 107 - 121
  • [4] Generalized non-renewing replacement warranty policy and an age-based post-warranty maintenance strategy
    Liu, Peng
    Wang, Guanjun
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 311 (02) : 567 - 580
  • [5] Optimal maintenance policies during the post-warranty period
    Jung, GM
    Park, DH
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2003, 82 (02) : 173 - 185
  • [6] Optimal warranty design and post-warranty maintenance for products subject to stochastic degradation
    Shang, Lijun
    Si, Shubin
    Sun, Shudong
    Jin, Tongdan
    [J]. IISE TRANSACTIONS, 2018, 50 (10) : 913 - 927
  • [7] Three-dimensional warranty and post-warranty maintenance of products with monitored mission cycles
    Shang, Lijun
    Liu, Baoliang
    Qiu, Qingan
    Yang, Li
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 239
  • [8] A Bivariate Post-Warranty Maintenance Model for the Product under a 2D Warranty
    Shang, Lijun
    Shang, Guojun
    Qiu, Qingan
    [J]. MATHEMATICS, 2022, 10 (12)
  • [9] The post-warranty random maintenance policies for the product with random working cycles
    Shang, Lijun
    Wang, Haibin
    Wu, Cang
    Cai, Zhiqiang
    [J]. EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2021, 23 (04): : 726 - 735
  • [10] Optimal post-warranty maintenance contracts for wind turbines considering availability
    Zheng, Rui
    Zhang, Yingzhi
    Gu, Liudong
    [J]. INTERNATIONAL JOURNAL OF GREEN ENERGY, 2020, 17 (07) : 373 - 381