共 50 条
- [1] Approximating Travel Times using Opportunistic Networking [J]. 2009 INTERNATIONAL CONFERENCE ON ADVANCED INFORMATION NETWORKING AND APPLICATIONS WORKSHOPS: WAINA, VOLS 1 AND 2, 2009, : 844 - 849
- [2] Using bus travel time data to estimate travel times on urban corridors [J]. DATA AND INFORMATION TECHNOLOGY, 2004, (1870): : 18 - 25
- [5] INVERSION OF SEISMIC TRAVEL TIMES USING TAU METHOD [J]. TRANSACTIONS-AMERICAN GEOPHYSICAL UNION, 1975, 56 (12): : 1021 - 1021
- [6] INVERSION OF SEISMIC TRAVEL TIMES USING TAU METHOD [J]. GEOPHYSICAL JOURNAL OF THE ROYAL ASTRONOMICAL SOCIETY, 1976, 47 (01): : 59 - 72
- [8] Estimating travel times for light rail using a probabilistic method [J]. ROAD & TRANSPORT RESEARCH, 2014, 23 (04): : 54 - 64
- [9] Analysis of the stability of travel times on traffic networks using ATIS [J]. ITE JOURNAL-INSTITUTE OF TRANSPORTATION ENGINEERS, 1998, 68 (10): : 18 - 18