Risk-Based Long-Term Renewal Planning and Budget Forecasting for Aging Pipelines

被引:0
|
作者
Chakraborti, Rajat K. [1 ]
Green, Jonathan M. [2 ]
Hollander, Maria C. [3 ]
Erichsen, George A. [3 ]
Hogan, Edward F. [3 ]
Kaur, Jagjit [1 ]
Lopezcalva, Enrique [4 ]
Santucci, Miranda [4 ]
机构
[1] Jacobs, Los Angeles, CA 90017 USA
[2] Jacobs, Crandall, TX USA
[3] St Marys Cty Metropolitan Commiss, California, MD USA
[4] Jacobs, Silver Spring, MD USA
来源
JOURNAL AWWA | 2023年 / 115卷 / 03期
关键词
Strategic Planning; Pipes; Forecasting; Pipelines; Rehabilitation; Cost Savings; Infrastructure; Capital Improvement Plan; Condition Assessment; Risks; Modeling; Planning; Budgeting; Utilities;
D O I
10.1002/awwa.2072
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Key Takeaways Strategic planning for pipe renewal and replacement (R&R) is key to saving money, maintaining high-quality service to customers, and preventing catastrophic infrastructure failures. A proactive capital improvement plan involves condition assessment, risk analysis, project prioritization, and creation of an R&R schedule, giving priority to pipes most in need. Scenario analysis using a powerful simulation model provides a systemwide forecast that is instrumental in planning, budgeting, and making the most of utility assets.
引用
收藏
页码:46 / 55
页数:10
相关论文
共 50 条
  • [1] A Risk-Based Long-Term Capital Planning Program
    Ganjidoost, Amin
    Daly, Craig
    Baird, Gregory M.
    [J]. PIPELINES 2021: PLANNING, 2021, : 1 - 7
  • [2] Long-Term Forecasting of Aging
    不详
    [J]. KGK-KAUTSCHUK GUMMI KUNSTSTOFFE, 2020, 73 (05): : 16 - 17
  • [3] LONG-TERM PLANNING AND FORECASTING
    HORSKA, Z
    [J]. POLITICKA EKONOMIE, 1977, 25 (08) : 673 - 682
  • [4] Desktop Analysis of Buried Pipelines to Develop Renewal Program and Long-Term Capital Improvement Planning
    Chakraborti, Rajat K.
    Kaur, Jagjit
    van der Tak, Laurens
    Green, Jonathan M.
    [J]. PIPELINES 2021: PLANNING, 2021, : 34 - 45
  • [5] FORECASTING AND LONG-TERM PLANNING IN SWEDEN
    HOTTOVY, T
    [J]. FUTURIBLES, 1976, (06) : 155 - 180
  • [6] FORECASTING AND LONG-TERM PLANNING IN SWEDEN
    HOTTOVY, T
    [J]. FUTURIBLES, 1977, (09) : 55 - 81
  • [7] LONG-TERM PLANNING AND FORECASTING IN USSR
    KHACHATU.TS
    [J]. AMERICAN ECONOMIC REVIEW, 1972, 62 (02): : 444 - 455
  • [8] LONG-TERM PLANNING AND FORECASTING IN EUROPE
    SOMBART, N
    [J]. LONG RANGE PLANNING, 1972, 5 (02) : 47 - &
  • [9] Risk-based maintenance planning of cross-country pipelines
    Ai-Khalill, M
    Assaf, S
    Al-Anazi, F
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2005, 19 (02) : 124 - 131
  • [10] A risk-based inspection planning method for corroded subsea pipelines
    Seo, Jung Kwan
    Cui, Yushi
    Mohd, Mohd Hairil
    Ha, Yeon Chul
    Kim, Bong Ju
    Paik, Jeom Kee
    [J]. OCEAN ENGINEERING, 2015, 109 : 539 - 552