Research on assembly scheduling problem with nested operations

被引:3
|
作者
Hao, Haiqiang [1 ]
Zhu, Haiping [1 ,2 ]
Shen, Liezheng [1 ]
Zhen, Guohui [1 ]
Chen, Zhipeng [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, Wuhan 430074, Peoples R China
[2] Natl Ctr Technol Innovat Intelligent Design & Num, Wuhan 430074, Peoples R China
关键词
Rocket tank; Assembly scheduling problem; Makespan; Improved genetic algorithm; Backward calculations; HYBRID GENETIC ALGORITHM; JOB-SHOP; OPTIMIZATION ALGORITHM; FLOWSHOP; SETUP; MINIMIZE; MACHINE; FLOWTIME; MODEL;
D O I
10.1016/j.cie.2022.108830
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A two-stage assembly scheduling problem with nested operations (nASP) is proposed to minimise the bi-criteria of makespan and the specified average passage time (P-ave) in the rocket tank welding workshop. The nASP's tanks are assembled utilising a variety of parts and machining techniques. Depending on the type of tank, there are different numbers of usable parts. Additionally, at the first stage, parallel available machines, operation-dependent setup times, unpredictable rework, and dynamic machining times are considered. Eight heuristics and two lower bounds are first developed, then a logistic-based improved genetic algorithm (LBIGA) is presented while considering the characteristics of the solutions. To further optimize the P-ave while maintaining the makespan, a heuristic built on backward computations is also suggested. Then, utilising the offered algorithms as well as genetic algorithm (GA), Tabu search (TS), and variable neighbourhood search (VNS) from the literature, randomly generated instances of nASP are resolved and compared. Ultimately, the numerical trials show the viability and efficacy of the presented algorithms.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Additive manufacturing scheduling problem considering assembly operations of parts
    Oğuzhan Ahmet Arık
    Operational Research, 2022, 22 : 3063 - 3087
  • [2] Additive manufacturing scheduling problem considering assembly operations of parts
    Arik, Oguzhan Ahmet
    OPERATIONAL RESEARCH, 2022, 22 (03) : 3063 - 3087
  • [3] Research on Ferry Vehicle Scheduling Problem Within Airport Operations
    Li, Qianwen
    Bi, Jun
    Li, Ziyu
    2017 10TH INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN (ISCID), VOL 2, 2017, : 248 - 251
  • [4] Research on the AGV Scheduling Problem in the No-buffer Assembly Line
    Wang X.-K.
    Wu W.-M.
    Xing Z.-C.
    Niu H.-Y.
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2024, 45 (01): : 58 - 67and75
  • [5] Computer assembly scheduling problem
    Al-Anzi, Fawaz S.
    Allahverdi, Ali
    2006 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2006, : 1188 - 1191
  • [6] THE PROBLEM OF SCHEDULING ON ASSEMBLY LINES
    VAZSONYI, A
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF AMERICA, 1954, 2 (03): : 351 - 351
  • [7] Simulation-based scheduling of assembly operations
    Weigert, G.
    Henlich, T.
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2009, 22 (04) : 325 - 333
  • [8] SCHEDULING JOB OPERATIONS IN AN AUTOMATIC ASSEMBLY LINE
    SHIN, KG
    ZHENG, Q
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1991, 7 (03): : 333 - 341
  • [10] A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations
    Fattahi, Parviz
    Hosseini, Seyed Mohammad Hassan
    Jolai, Fariborz
    Tavakkoli-Moghaddam, Reza
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (01) : 119 - 134