From the new Austrian tunneling method to the geoengineering condition evaluation and dynamic controlling method

被引:0
|
作者
Yanjun Shang [1 ]
Kun Li [1 ]
Wantong He [1 ]
Chunbo Sheng [2 ]
机构
[1] Key Laboratory of Engineering Geomechanics, Institute of Geology and Geophysics, Chinese Academy of Sciences
基金
中国国家自然科学基金;
关键词
Unfavorable geological body(UGB) Multi-factor interaction matrix Discontinuity dynamic controlling(DDC) Cut slope Geoengineering condition evaluation and dynamic controlling(GEDC) method;
D O I
暂无
中图分类号
U412.22 [土壤、地质和地理勘测];
学科分类号
081601 ;
摘要
The new Austrian tunneling method(NATM) is widely applied in design and construction of underground engineering projects. When the type and distribution of unfavorable geological bodies(UGBs)associated with their influences on geoengineering are complicated or unfortunately are overlooked, we should pay more attentions to internal features of rocks grades IV and V(even in local but mostly controlling zones). With increasing attentions to the characteristics, mechanism and influences of engineering construction-triggered geohazards, it is crucial to fully understand the disturbance of these geohazards on project construction. A reasonable determination method in construction procedure, i.e.the shape of working face, the type of engineering support and the choice of feasible procedure, should be considered in order to mitigate the construction-triggered geohazards. Due to their high sensitivity to groundwater and in-situ stress, various UGBs exhibit hysteretic nature and failure modes. To give a complete understanding on the internal causes, the emphasis on advanced comprehensive geological forecasting and overall reinforcement treatment is therefore of more practical significance. Comprehensive evaluation of influential factors, identification of UGB, and measures of discontinuity dynamic controlling comprises the geoengineering condition evaluation and dynamic controlling method. In a case of a cut slope, the variations of UGBs and the impacts of key environmental factors are presented,where more severe construction-triggered geohazards emerged in construction stage than those predicted in design and field investigation stages. As a result, the weight ratios of different influential factors with respect to field investigation, design and construction are obtained.
引用
下载
收藏
页码:366 / 372
页数:7
相关论文
共 50 条
  • [1] From the new Austrian tunneling method to the geoengineering condition evaluation and dynamic controlling method
    Shang, Yanjun
    Li, Kun
    He, Wantong
    Sheng, Chunbo
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2014, 6 (04) : 366 - 372
  • [2] New Austrian Combined Tunneling Method.
    Brunner, Anton
    Strassen- und Tiefbau, 1985, 39 (04):
  • [3] Numerical evaluation of new Austrian tunneling method excavation sequences: A case study
    Hafeezur Rehman
    Abdul Muntaqim Najia
    Wahid Ali
    Muhammad Junaid
    Rini Asnida Abdullah
    Han-kyu Yoo
    International Journal of Mining Science and Technology, 2020, 30 (03) : 381 - 386
  • [4] Numerical evaluation of new Austrian tunneling method excavation sequences: A case study
    Rehman, Hafeezur
    Naji, Abdul Muntaqim
    Ali, Wahid
    Junaid, Muhammad
    Abdullah, Rini Asnida
    Yoo, Han-kyu
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2020, 30 (03) : 381 - 386
  • [5] The new Austrian tunneling method with single-shell shotcrete lining
    Golser, J
    Brandl, J
    SHOTCRETE TECHNOLOGY, 1996, : 65 - 69
  • [6] New Austrian tunneling method: Directly under an expressway on weak silt
    Fujimoto, K.
    Yorita, J.
    Sasaki, Y.
    Yamaki, N.
    Okamura, M.
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 971 - +
  • [7] New Method of Controlling Grinding Accuracy with Dynamic Compensatory
    Xu, Huibin
    Tao, Jianwu
    Gao, Xiang
    2010 INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT (CCCM2010), VOL III, 2010, : 283 - 286
  • [8] New Method of Controlling Grinding Accuracy with Dynamic Compensatory
    Xu, Huibin
    Tao, Jianwu
    Gao, Xiang
    INTERNATIONAL CONFERENCE ON APPLIED PHYSICS AND INDUSTRIAL ENGINEERING 2012, PT B, 2012, 24 : 1277 - 1284
  • [9] Safety aspects of flexible new Austrian tunneling method versus stiff shotcrete linings
    Launay, J
    DESIGN OF STRUCTURES 2002: BRIDGES, OTHER STRUCTURES, AND HYDRAULICS AND HYDROLOGY, 2002, (1814): : 113 - 120
  • [10] ANALYSIS AND MONITORING OF THE MIYANA RAILWAY TUNNEL CONSTRUCTED USING THE NEW AUSTRIAN TUNNELING METHOD
    YOSHIMURA, H
    YUKI, T
    YAMADA, Y
    KOKUBUN, N
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 1986, 23 (01): : 67 - 75