共 50 条
- [1] The Demand Forecast of Spare Parts Based on Group Technology [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 6706 - 6709
- [2] Equipment Spare Parts Demand Forecasting Model Based on Grey Neural Network [J]. 2012 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (ICQR2MSE), 2012, : 1274 - 1277
- [3] Demand prediction of the Rarely used spare parts Based on the BP neural network [J]. COMPUTER AND INFORMATION TECHNOLOGY, 2014, 519-520 : 1513 - +
- [4] Regional logistics demand forecast based on RBF artificial neural network model [J]. PROCEEDINGS OF 2003 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2003, : 386 - 390
- [5] Research on demand forecast of spare parts of wind turbine based on system dynamics [J]. Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2019, 40 (03): : 666 - 672
- [6] A Demand Forecast Method for Expressway Spare Parts Based on Analysis of Influencing Factors [J]. CICTP 2020: TRANSPORTATION EVOLUTION IMPACTING FUTURE MOBILITY, 2020, : 1433 - 1446
- [7] Combination Forecasting Based on SVM and Neural Network for Urban Rail Vehicle Spare parts Demand [J]. PROCEEDINGS OF THE 36TH CHINESE CONTROL CONFERENCE (CCC 2017), 2017, : 4660 - 4665
- [8] Stock Market Forecast Based on RBF Neural Network [J]. PRACTICAL APPLICATIONS OF INTELLIGENT SYSTEMS, ISKE 2013, 2014, 279 : 955 - 962
- [9] Neural network approach to lumpy demand forecasting for spare parts in process industries [J]. 2008 INTERNATIONAL CONFERENCE ON COMPUTER AND COMMUNICATION ENGINEERING, VOLS 1-3, 2008, : 1378 - 1382
- [10] Evaluation of Spare Parts Scheme Based on BP Neural Network [J]. 2019 PROGNOSTICS AND SYSTEM HEALTH MANAGEMENT CONFERENCE (PHM-QINGDAO), 2019,