共 50 条
- [2] Amending schedule-cost coefficient correlation based on historical statistics [J]. Proceedings of the 2005 IEEE International Conference on Information Reuse and Integration, 2005, : 300 - 305
- [3] Research on Optimization of Schedule-Cost Risk for R&D Project [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 284 - 289
- [4] Schedule-cost Joint Management of Thermal Power Construction Project Based on Improved Earned Value Method [J]. PROCEEDINGS OF THE 2017 3RD INTERNATIONAL CONFERENCE ON HUMANITIES AND SOCIAL SCIENCE RESEARCH (ICHSSR 2017), 2017, 121 : 35 - 39
- [5] Factors that Influence Software Project Cost and Schedule Estimation [J]. PROCEEDINGS OF 2017 SUDAN CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY (SCCSIT), 2017, : 24 - 32
- [7] Method Study of Software Project Schedule Estimation Guide [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7602 - 7605
- [8] Correlation Coefficient Estimation for Stochastic FDTD Method [J]. 2014 7TH INTERNATIONAL SYMPOSIUM ON TELECOMMUNICATIONS (IST), 2014, : 234 - 238
- [9] Coordination of Construction Project Cost and Schedule based on Grey Forecasting Method [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2259 - +
- [10] ON THE MINIMUM-COST PROJECT SCHEDULE [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1995, 23 (04): : 468 - 468