Welding technique studies on the “West-East” pipeline project

被引:1
|
作者
隋永莉
杜则裕
黄福祥
祁励春
机构
[1] Pipeline Research Institute of China National Petroleum Corporation Langfang 065001 Tianjin 300072 Tianjin 300072
[2] School of Materials Science and Engineering Tianjin University
[3] School of Materials Science and Engineering Tianjin University
[4] Tianjin 300072
关键词
West-East; welding technique; process design; mechanical properties of welded joint;
D O I
暂无
中图分类号
TG457.6 [管道焊接];
学科分类号
080201 ; 080503 ;
摘要
This paper described the work of welding process design for the “West-East” pipeline project, which is high pressure, large diameter and heavy wall thickness. According to the different geographical situation, climate, culture and the flexibility of the welding methods, this work recommended the semi-automatic process at the east and middle sections and automatic process at the west section of the pipeline project. The manual process is recommended on the tie-in joints and repairs. The double joint pipe and the 3 joint pipe are recommended at the water net place and some in-ditch welding place to reduce the welding volume. Also the special redesigned bevels are recommended for the automatic process and the semi-automatic process. Through all destructive tests, the results shows the welds are meet the requirements of related standards, specifications and design documents.
引用
收藏
页码:73 / 76
页数:4
相关论文
共 50 条