Skid-mounted Cementing & Fracturing unit for Desert Oil Field Passing Appraisal

被引:0
|
作者
机构
关键词
Fracturing unit for Desert Oil Field Passing Appraisal; Skid-mounted Cementing;
D O I
暂无
中图分类号
P618.13 [石油、天然气];
学科分类号
0709 ; 081803 ;
摘要
引用
收藏
页码:87 / 87
页数:1
相关论文
共 4 条
  • [1] SKID-MOUNTED AUTOMATED COGENERATED UNITS AND THEIR USE FOR OIL-RECOVERY INCREASE
    PASHIN, ST
    [J]. NEFTYANOE KHOZYAISTVO, 1990, (06): : 52 - 54
  • [2] SKID-MOUNTED SYSTEM FOR BOTH WEIGHTED AND UNWEIGHTED MUDS DEVELOPED AND FIELD TESTED
    KALIL, IA
    SPEERS, JM
    ROBINSON, LH
    [J]. OIL & GAS JOURNAL, 1982, 80 (15) : 132 - &
  • [3] Design, development and performance evaluation of skid-mounted pilot wastewater treatment and resource recovery unit for mechanical scavenging vehicle
    Mukherjee, Anupam
    Chalicheemala, Srinath
    Roy, Subhankar
    Mullick, Aditi
    De, Sirshendu
    Roy, Anirban
    Moulik, Siddhartha
    [J]. JOURNAL OF CLEANER PRODUCTION, 2022, 371
  • [4] Numerical Study on the Internal Flow Fluid of the Gas-Liquid Separation Unit in a New Skid-mounted Device with Gas-Liquid Separation and Flash Distillation
    Ma, Hongqiang
    Wang, Li
    Hou, Caiqin
    Han, Xilian
    Luo, Xinmei
    Li, Shaoyong
    [J]. Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2021, 53 (02): : 171 - 177