Distributed Control System Retrofit for 200 MW Units of Thermal Power Plant

被引:0
|
作者
Su Guoquan
Zhao Yangdng
Fan Qinnan
Pu Weixing
Zhu Chuanqiang (Nanjing Automation Research Institute)
机构
关键词
distributed control system expert system direct energy balance (DEB);
D O I
暂无
中图分类号
TM621 [火力发电厂、热电站];
学科分类号
080802 ;
摘要
This paper introduces GKS-9000 Distributed Control System (DCS)developed by Nanjing Automation Research Institute (NARI) and its application in DCS retrofit project of indigenous 200 MW units and its feature.
引用
收藏
页码:34 / 37
页数:4
相关论文
共 50 条
  • [1] Retrofit of condenser of indigenous 200 MW steam turbine in Shengli Thermal Power Plant
    Ji, Guangqin
    Lei, Yuting
    Wang, Gongzheng
    Xu, Ye
    Wang, Wenzhong
    Xiong, Xingming
    Tan, Shuke
    [J]. Zhongguo Dianli/Electric Power, 2000, 33 (08): : 25 - 27
  • [2] Comprehensive Refurbishment of 200 MW Thermal Power Generating Units
    Zhang Fuyin(Northeast China Electric Power Group Corp.)Shi Mingwu(Northeast China Electric Power Research Institute)
    [J]. Electricity, 1997, (02) : 26 - 30
  • [3] Speed up the Retrofit of Thermal Power Generating Units, Raise the Effectiveness of Power Plant Comprehensively
    Jiang Zhesheng
    [J]. Electricity, 2000, (01) : 13 - 16
  • [4] DISTRIBUTED CONTROL-SYSTEM ARCHITECTURE FOR A THERMAL POWER-PLANT
    PURAKAYASTHA, P
    [J]. ELECTRONICS INFORMATION & PLANNING, 1987, 14 (08): : 436 - 444
  • [5] A real-time simulation of a 200MW thermal power plant for optimising combustion control
    Geddes, DJ
    Bailie, APH
    Cregan, M
    Swidenbank, E
    [J]. UKACC INTERNATIONAL CONFERENCE ON CONTROL '98, VOLS I&II, 1998, : 859 - 864
  • [6] Flexible dispatch of a power system with wind power considering thermal energy storage retrofit of thermal power units
    Lu Y.
    Ma L.
    Zhang L.
    Wu G.
    [J]. Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2022, 50 (23): : 75 - 84
  • [7] Distributed control system applied to 200 MW gene rating unit
    Jia, Min
    Gao, Wei
    [J]. Zhendong Ceshi Yu Zhenduan/Journal of Vibration, Measurement & Diagnosis, 2000, 20 (SUPPL.): : 80 - 84
  • [8] Optimization of retrofit period for control system in thermal power plants
    Shin, Man-Su
    Park, Du-Yong
    Lim, Geon-Pyo
    Jeong, Tae-Won
    [J]. INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND SYSTEMS (ICCAS 2010), 2010, : 883 - 886
  • [9] INTRODUCTION OF EMERGENCY UNLOADING SYSTEM TO 200 MW UNITS AT BOKSBERG THERMAL POWER-STATION (EAST-GERMANY)
    KASYANOV, LN
    MAKSYUTA, OI
    ZAIDENTREGER, VL
    FELDMAN, AI
    ILINA, VD
    [J]. THERMAL ENGINEERING, 1974, 21 (07) : 43 - 53
  • [10] A nuclear power plant distributed control system
    Aimar, M
    Arnaud, G
    Dumas, M
    [J]. (SAFEPROCESS'97): FAULT DETECTION, SUPERVISION AND SAFETY FOR TECHNICAL PROCESSES 1997, VOLS 1-3, 1998, : 391 - 396