The construction of the 100 kt/a butadiene unit was kicked off at the SINOPEC Yangzi Branch Company in Nanjing on March 20,2007.The prime contractor of this project is the Yangzi Petrochemical Engineering Co.,and the project de- sign is jointly performed by the SINOPEC Shanghai Engi- neering Co.and the Yangzi Petrochemical Design & Engi-