Construction Process Simulation and Safety Analysis Based on Building Information Model and 4D Technology

被引:12
|
作者
胡振中 [1 ]
张建平 [1 ]
邓资银 [1 ]
机构
[1] Department of Civil Engineering, Tsinghua University
基金
中国国家自然科学基金;
关键词
building information model (BIM); four-dimensional (4D) technology; structure analysis; construc-tion simulation; industry foundation class;
D O I
暂无
中图分类号
TU17 [电子计算机在建筑中的应用];
学科分类号
081304 ;
摘要
Time-dependent structure analysis theory has been proved to be more accurate and reliable compared to commonly used methods during construction. However, so far applications are limited to partial period and part of the structure because of immeasurable artificial intervention. Based on the building informa-tion model (BIM) and four-dimensional (4D) technology, this paper proposes an improves structure analysis method, which can generate structural geometry, resistance model, and loading conditions automatically by a close interlink of the schedule information, architectural model, and material properties. The method was applied to a safety analysis during a continuous and dynamic simulation of the entire construction process. The results show that the organic combination of the BIM, 4D technology, construction simulation, and safety analysis of time-dependent structures is feasible and practical. This research also lays a foundation for further researches on building lifecycle management by combining architectural design, structure analysis, and construction management.
引用
收藏
页码:266 / 272
页数:7
相关论文
共 50 条
  • [1] Study on the Modeling Technology of the 4D Process Information Model of the Mechanic Products
    Tan Ying
    Yin Guofu
    Tan Wenrong
    Chen Jianying
    [J]. 2009 INTERNATIONAL FORUM ON COMPUTER SCIENCE-TECHNOLOGY AND APPLICATIONS, VOL 1, PROCEEDINGS, 2009, : 122 - +
  • [2] Research on 4D Simulation Technology of Reconstruction Engineering Construction Organization Based on BIM
    Wang, Chen
    Liu, Xiangsheng
    Zhang, Kechao
    [J]. 2020 2ND GLOBAL CONFERENCE ON ECOLOGICAL ENVIRONMENT AND CIVIL ENGINEERING, 2020, 568
  • [3] Application of 4D visualization technology for safety management in metro construction
    Zhou, Y.
    Ding, L. Y.
    Chen, L. J.
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 34 : 25 - 36
  • [4] Automated construction progress measurement using a 4D building information model and 3D data
    Kim, Changmin
    Son, Hyojoo
    Kim, Changwan
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 31 : 75 - 82
  • [5] Monitoring Construction Progress Based on 4D BIM Technology
    Chen, Jingjing
    Wu, Juan
    Qu, Yan
    [J]. 6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [6] Information Modeling for 4D BIM-Based Construction Robot Task Planning and Simulation
    Oyedira, Hafiz
    Turner, William
    Kim, Kyungki
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: ADVANCED TECHNOLOGIES, AUTOMATION, AND COMPUTER APPLICATIONS IN CONSTRUCTION, 2024, : 816 - 825
  • [7] Hazard ontology and 4D benchmark model for facilitation of automated construction safety requirement analysis
    Johansen, Karsten W.
    Schultz, Carl
    Teizer, Jochen
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2023, 38 (15) : 2128 - 2144
  • [8] Modeling construction equipment in 4D simulation
    Amrollahibuki, R.
    Hammad, A.
    [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2018, : 243 - 250
  • [9] 4D model based automated construction activity monitoring
    Rebolj, D.
    Podbreznik, P.
    Babic, N. C.
    [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTIO N, 2009, : 553 - 556
  • [10] An integrated safety management with construction management using 4D CAD model
    Benjaoran, Vacharapoom
    Bhokha, Sdhabhon
    [J]. SAFETY SCIENCE, 2010, 48 (03) : 395 - 403