Hybrid assessment of pre-blasting weakening to horizontal section top coal caving (HSTCC) in steep and thick seams

被引:0
|
作者
Lai Xingping [1 ,2 ]
Shan Pengfei [1 ,2 ]
Cao Jiantao [1 ,2 ]
Sun Huan [1 ,2 ]
Suo Zhengyong [1 ,2 ]
Cui Feng [1 ,2 ]
机构
[1] College of Energy Engineering,Xi'an University of Science and Technology
[2] Key Laboratory of Western Mines and Hazard Prevention,Ministry of Education of China
基金
国家高技术研究发展计划(863计划); 中国国家自然科学基金;
关键词
Pre-blasting weakening HSTCC Steep and thick seams Explosive scheme In situ hybrid monitoring;
D O I
暂无
中图分类号
TD823.49 [];
学科分类号
摘要
Horizontal section top-coal(HSTCC)caving offers a powerful method to efficiently excavate rude coal in steep and thick seams,and pre-blasting weakening has a profound effect on pursuing great production,high efficiency and good benefit under particular conditions like a small-scale working face with large-scale sectional caving height.+564-level HSTCC working face in B3–6coal seams of Jiangou Colliery in Urumqi was taken as study case for in situ industrial experiment.Total thickness of seams in the study case is about 50.0 m and average angel here is over 83°.In the industrial experiments,at first we adopted continuous charge machine and emulsion matrix explosive to substitute for traditional blasting schemes for specific geological settings in the study case.Hybrid analyses and assessments with blasting crack propagation analysis,abutment pressure monitoring prediction and economical benefit assessment were attributed to be able to attest pre-blasting weakening effects practically.Meanwhile crack propagation analysis after pre-blasting weakening showed that in all triple monitoring bore holes rock masses of top-coal would be fallen into three stages from the bottom up:fracture zone,plastic zone and elastic zone generally,and fracture toughness respectively in correspondent zones was calculated by the analytical formula:0.5616–0.8806,0.6403–0.9541 and0.7535–1.1900 MPa m1/2after pre-blasting weakening.Pressure monitoring prediction and economical benefit assessment also indicated that it was necessary to introduce the pre-blasting weakening with predominant blasting scheme from both views.For excavation in extremely steep and thick coal seams,relevant results would be a useful tool to study the mechanism of pre-blasting weakening both qualitatively and quantitatively.
引用
收藏
页码:31 / 37
页数:7
相关论文
共 15 条
  • [1] Hybrid assessment of pre-blasting weakening to horizontal section top coal caving (HSTCC) in steep and thick seams
    Lai Xingping
    Shan Pengfei
    Cao Jiantao
    Sun Huan
    Suo Zhengyong
    Cui Feng
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2014, 24 (01) : 31 - 37
  • [2] Analysis on weakening effect of pre-blasting in top coal of steep and thick seams based on nonlinear dynamics
    Cui, F.
    Lai, X. P.
    Cao, J. T.
    ROCK MECHANICS: ACHIEVEMENTS AND AMBITIONS, 2012, : 775 - 778
  • [3] Segment pre-blasting of sublevel caving of steep and thick coal seam under complex conditions
    Zhang, Zi-Fei
    Lai, Xing-Ping
    Meitan Xuebao/Journal of the China Coal Society, 2008, 33 (08): : 845 - 848
  • [4] Segment pre-blasting application on 52 m sublevel caving of steep and thick coal seam under complex conditions
    Miao, S. J.
    Lai, X. P.
    ROCK STRESS AND EARTHQUAKES, 2010, : 355 - 359
  • [5] Mine Pressure Behavior of Horizontal Section Top-coal Caving in Steep and Ultra Thick Coal Seam
    Li, Li
    Yang, Yang
    Li, Chunyuan
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (07): : 2537 - 2549
  • [6] Mechanism of rock burst in steep and extremely thick coal seam using horizontal section top-coal caving
    He J.
    Dou L.
    Cao J.
    Wu J.
    Cao L.
    Meitan Xuebao/Journal of the China Coal Society, 2020, 45 (05): : 1701 - 1709
  • [7] Analysis on unloaded arch structure of roof in mining steep seams using horizontal section top-coal caving
    College of Resource and Energy, Xi'an University of Science and Technology, Xi'an 710054, China
    不详
    Beijing Keji Daxue Xuebao, 2007, 5 (447-451):
  • [9] Top coal flows in an excavation disturbed zone of high section top coal caving of an extremely steep and thick seam
    Miao ShengjunaLai XingpingbCui Fengb a Civil Environmental Engineering SchoolUniversity of Science and TechnologyBeijing China b School of Energy EngineeringXian University of Science and TechnologyXian China
    MiningScienceandTechnology, 2011, 21 (01) : 99 - 105
  • [10] Principle of rockburst control by weakening static and dynamic loading using top-coal caving in the mining of thick coal seams
    Dou, Linming
    Li, Zhenlei
    He, Xueqiu
    Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2018, 47 (02): : 221 - 230