Equipment Development Risk Evaluation Based on Fuzzy Comprehensive Evaluation

被引:1
|
作者
苏续军 [1 ]
荣丽卿 [2 ]
王亚彬 [2 ]
史宪铭 [2 ]
机构
[1] Department of Artillery Engineering,Mechanical Engineering College
[2] Department of Management Engineering,Mechanical Engineering College
关键词
risk management; equipment development; fuzzy comprehensive evaluation;
D O I
10.19884/j.1672-5220.2015.06.024
中图分类号
E27 [各种武装力量(各军、兵种)];
学科分类号
1104 ;
摘要
The equipment development risk evaluation refers to evaluating the equipment risks in the equipment development phase based on risk analysis,risk score calculation,and risk level identification.The results could lead the direction of future work.The risk management in equipment development phase was studied.The risk management model in equipment development phases was established on the base of basic theories in risk management and some interrelated risk management models in other fields.The application of the established model was illuminated by an instance.
引用
收藏
页码:998 / 1000
页数:3
相关论文
共 50 条
  • [1] Safety evaluation of nanomaterials in fitness equipment based on fuzzy comprehensive evaluation
    Hua, Rui
    [J]. International Journal of Nano and Biomaterials, 2019, 8 (3-4) : 181 - 188
  • [2] Research on the Equipment Support Effectiveness Evaluation Based on Fuzzy Comprehensive Evaluation method
    Zhao, Xiang
    Chen, Gang
    [J]. ADVANCED RESEARCH ON MATERIAL ENGINEERING, CHEMISTRY AND BIOINFORMATICS, PTS 1 AND 2 (MECB 2011), 2011, 282-283 : 761 - +
  • [3] The Fuzzy Comprehensive Evaluation of Real Estate Development Risk Based on AHP
    Li Jinghua
    Sun Yan
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 118 - 122
  • [4] Fuzzy Comprehensive Evaluation on the Sustainable Development of Equipment Manufacturing Industry Based on Improved Algorithm
    Shi, Chenghua
    Zhang, Kui
    Ruan, Junhu
    [J]. IITAW: 2009 THIRD INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATIONS WORKSHOPS, 2009, : 173 - +
  • [5] The method of risk evaluation for equipment development based on triangular fuzzy number and TOPSIS
    Zhou, Shao-qi
    Chang, Wen-bing
    Zhou, Sheng-han
    Liu, Wei
    [J]. 26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 2272 - 2276
  • [6] Criticality evaluation of petrochemical equipment based on fuzzy comprehensive evaluation and a BP neural network
    Guo, Lijie
    Gao, Jinji
    Yang, Jianfeng
    Kang, Jianxin
    [J]. JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2009, 22 (04) : 469 - 476
  • [7] The Research on Development Risk of Green Construction Material Based on Fuzzy Comprehensive Evaluation
    Zhang Yunning
    Liu Gang
    [J]. INSTRUMENTATION, MEASUREMENT, CIRCUITS AND SYSTEMS, 2012, 127 : 679 - 685
  • [8] REASERCH OF WEAPONS AND EQUIPMENT CAPABILITY EVALUATION BASED ON COMPREHENSIVE FUZZY MODEL
    Gao, Jingdong
    Xiao, Jinshi
    Dong, Jichang
    Ren, Xiongwei
    [J]. 2012 IEEE 2nd International Conference on Cloud Computing and Intelligent Systems (CCIS) Vols 1-3, 2012, : 1307 - 1310
  • [9] Research of the equipment selected based on AHP and fuzzy comprehensive evaluation method
    Chai Furong
    Wang Hongjun
    [J]. PROCEEDINGS OF THE FIFTH INTERNATIONAL SYMPOSIUM ON TEST AUTOMATION & INSTRUMENTATION, VOLS 1 AND 2, 2014, : 565 - 569
  • [10] Evaluation for Disposition Plans of Ex-service Equipment Based on Fuzzy Comprehensive Evaluation Method
    Tan, Baichun
    Sheng, Silian
    Li, Hongxun
    Zhang, Weifeng
    Chen, Guang
    [J]. 2014 SIXTH INTERNATIONAL CONFERENCE ON INTELLIGENT HUMAN-MACHINE SYSTEMS AND CYBERNETICS (IHMSC), VOL 1, 2014, : 70 - 73