共 50 条
- [1] Long-term stability analysis of large-scale underground plant of Xiangjiaba hydro-power station [J]. Journal of Central South University, 2011, 18 : 511 - 520
- [2] Long-term stability analysis of large-scale underground plant of Xiangjiaba hydro-power station [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2011, 18 (02): : 511 - 520
- [5] Viscoelasto-plastic finite element analysis of stability of surrounding rock for underground powerhouse of Xiangjiaba hydro-power station [J]. Yantu Lixue/Rock and Soil Mechanics, 2010, 31 (04): : 1276 - 1282
- [6] Research on Back Analysis of Parameters for Excavation of the Underground Cavern Group of A Large-scale Hydro-power Station by Using Orthogonal Optimization [J]. PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 3356 - +
- [7] Large-Scale and Long-Term CPV Power Plant Field Results [J]. 11TH INTERNATIONAL CONFERENCE ON CONCENTRATOR PHOTOVOLTAIC SYSTEMS (CPV-11), 2015, 1679
- [8] THE STRUCTURE FORM COMPARISON AND STABILITY ANALYSIS OF LARGE-SCALE UNDERGROUND STATION [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 921 - 926
- [10] Stability analysis of layered surrounding rock mass of large underground powerhouse of Xiangjiaba hydropower station [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2010, 29 (07): : 1307 - 1313