TBM tunneling in mixed-face ground: Problems and solutions

被引:0
|
作者
Ma Hongsu [1 ]
Yin Lijun [2 ]
Gong Qiuming [3 ]
Wang Ju [1 ]
机构
[1] CNNC Beijing Research Institute of Uranium Geology
[2] Ecole Polytechnique Federalede Lausanne (EPFL)
[3] Key Laboratory of Urban Security and Disaster Engineering of Ministry of Education, Beijing University of Technology
基金
中国国家自然科学基金;
关键词
TBM; Mixed face ground; Influencing factor; Problems; Solutions;
D O I
暂无
中图分类号
U455 [隧道施工];
学科分类号
摘要
Mixed-face ground encountered in Tunnel Boring Machine(TBM) tunneling presents great challenges and may trigger potential hazards without warning. A detailed understanding of such unfavorable conditions is therefore critical to a successful bored tunnel. In this paper, we firstly present a brief review of the definition, classification and the factors related to mixed-face conditions. Secondly, for a better understanding of this topic, we investigate the main difficulties and problems involved in TBM tunnelling under mixed-face ground with detailed cases. Thirdly, from the viewpoint of rock-machine interaction, we give some suggestions on the corresponding mitigation measurements from three categories:(i) selection of TBM type and modification of TBM,(ii) condition of ground and(iii) optimization of TBM operation.
引用
收藏
页码:641 / 647
页数:7
相关论文
共 50 条
  • [1] TBM tunneling in mixed-face ground: Problems and solutions
    Ma Hongsu
    Yin Lijun
    Gong Qiuming
    Wang Ju
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2015, 25 (04) : 641 - 647
  • [2] Prediction of TBM performance in mixed-face ground conditions
    Vergara, Isaac Madrid
    Saroglou, Charalampos
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 69 : 116 - 124
  • [3] Physical model tests of the surrounding rock deformation and fracture mechanism of mixed-face ground under TBM tunneling
    Zhou, Hui
    Song, Ming
    Zhang, Chuanqing
    Hu, Dawei
    Lu, Jingjing
    EUROPEAN JOURNAL OF ENVIRONMENTAL AND CIVIL ENGINEERING, 2020, 24 (11) : 1744 - 1760
  • [4] TBM tunneling in squeezing ground: Problems and solutions
    Ma, H. S.
    Wang, J.
    Yin, L. J.
    PROGRESS IN MINE SAFETY SCIENCE AND ENGINEERING II, 2014, : 339 - 345
  • [5] The significance of mixed-face conditions for TBM performance
    Steingrimsson, Jón Haukur
    Grøv, Eivind
    Nilsen, Bjøorn
    World Tunnelling, 2002, 15 (09): : 435 - 441
  • [6] The mechanism of hysteretic ground settlement caused by shield tunneling in mixed-face conditions
    Ming-zhong Gao
    Zhi-long Zhang
    Zhi-qiang Qiu
    Chuan Xu
    Jian Zhao
    Geomechanics and Geophysics for Geo-Energy and Geo-Resources, 2018, 4 : 51 - 61
  • [7] The mechanism of hysteretic ground settlement caused by shield tunneling in mixed-face conditions
    Gao, Ming-zhong
    Zhang, Zhi-long
    Qiu, Zhi-qiang
    Xu, Chuan
    Zhao, Jian
    GEOMECHANICS AND GEOPHYSICS FOR GEO-ENERGY AND GEO-RESOURCES, 2018, 4 (01) : 51 - 61
  • [8] Dynamic characteristic analysis of TBM tunnelling in mixed-face conditions
    Zhang, Kaizhi
    Yu, Haidong
    Liu, Zhongpo
    Lai, Xinmin
    SIMULATION MODELLING PRACTICE AND THEORY, 2010, 18 (07) : 1019 - 1031
  • [9] Field Monitoring on Ground-Borne Vibration Caused by TBM Excavating in Mixed-Face Conditions
    Liu, Meng-Bo
    Liao, Shao-Ming
    Men, Yan-Qing
    Sun, Lian-Yong
    GEO-CONGRESS 2022: DEEP FOUNDATIONS, EARTH RETENTION, AND UNDERGROUND CONSTRUCTION, 2022, 332 : 554 - 561
  • [10] Ground stabilization for tunnel construction in mixed-face conditions
    Darrag, AA
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1999, 14 (03) : 319 - 326