共 50 条
- [1] INDUSTRIAL FURNACE PRODUCTION FOR AUTOMOTIVE INDUSTRY METALLURGIA AND METAL FORMING, 1974, 41 (02): : 43 - 43
- [4] A Capacitated Material Requirements Planning Model considering Delivery Constraints: A Case Study from the Automotive Industry. CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 378 - 383
- [5] Tactical horizon production planning in the automotive industry GOL'20: 2020 5TH INTERNATIONAL CONFERENCE ON LOGISTICS OPERATIONS MANAGEMENT (GOL), 2020, : 110 - 115
- [6] A Decision Support System for Aggregate Production Planning based on MILP: A Case Study from the Automotive Industry CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 366 - 371
- [8] Organisational Constraints in Data-driven Maintenance: a case study in the automotive industry IFAC PAPERSONLINE, 2020, 53 (03): : 95 - 100
- [10] The digital factory - Planning and simulation of production in automotive industry Informatics in Control, Automation and Robotics I, 2006, : 27 - 29