Industrial Constraints of Production Planning: A Case Study in the Automotive Industry

被引:0
|
作者
Mahmoud, Ayman [1 ,3 ]
Benbitour, Hichame [2 ]
Jemai, Zied [1 ]
Sahin, Evren [1 ]
Baratte, Marc [3 ]
机构
[1] Univ Paris Saclay, Lab Genie Ind, F-91190 Gif Sur Yvette, France
[2] EM Normandie Business Sch, Metis Lab, F-92110 Clichy, France
[3] Renault SAS, F-78289 Guyancourt, France
关键词
Production Planning; Automotive Industry; Industrial Constraints; Data in Supply Chain; MODEL;
D O I
10.1007/978-3-031-68634-4_23
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper compares production planning in the automotive industry, contrasting fixed industrial capacity constraints with real-time data utilization. It employs real data from a Renault Group manufacturing facility to demonstrate the benefits of improved component availability visibility. We introduce the comparative study on a use case. This work emphasises how real-time data can improve the supply chain's performance and the production plan's quality. By incorporating real-time data, the study successfully reduces the average lead time for order manufacturing and minimizes average lateness by 0.5 production days. The study contributes insights into the impact of constraint flexibility, particularly regarding component availability, on real-world production planning outcomes.
引用
收藏
页码:249 / 259
页数:11
相关论文
共 50 条
  • [1] INDUSTRIAL FURNACE PRODUCTION FOR AUTOMOTIVE INDUSTRY
    KALLHARD.K
    METALLURGIA AND METAL FORMING, 1974, 41 (02): : 43 - 43
  • [2] Industrial upgrading in global production networks: the case of the Chinese automotive industry
    Li, Yan Sheng
    Kong, Xin Xin
    Zhang, Miao
    ASIA PACIFIC BUSINESS REVIEW, 2016, 22 (01) : 21 - 37
  • [3] Production planning in automotive powertrain plants: a case study
    Lalami, Idris
    Frein, Yannick
    Gayon, Jean-Philippe
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (18) : 5378 - 5393
  • [4] A Capacitated Material Requirements Planning Model considering Delivery Constraints: A Case Study from the Automotive Industry.
    Garcia-Sabater, Jose P.
    Maheut, Julien
    Garcia-Sabater, Julio J.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 378 - 383
  • [5] Tactical horizon production planning in the automotive industry
    Mansouri, Samiha
    Ouzizi, Latifa
    Aoura, Youssef
    Douimi, Mohammed
    GOL'20: 2020 5TH INTERNATIONAL CONFERENCE ON LOGISTICS OPERATIONS MANAGEMENT (GOL), 2020, : 110 - 115
  • [6] A Decision Support System for Aggregate Production Planning based on MILP: A Case Study from the Automotive Industry
    Garcia-Sabater, Jose P.
    Maheut, Julien
    Garcia-Sabater, Julio J.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 366 - 371
  • [7] Optimization of Welding Pliers Production for the Automotive Industry - Case Study
    Mikusova, Nikoleta
    Badiarova, Sona
    Jerabek, Karel
    ADVANCES IN SCIENCE AND TECHNOLOGY-RESEARCH JOURNAL, 2020, 14 (04) : 240 - 249
  • [8] Organisational Constraints in Data-driven Maintenance: a case study in the automotive industry
    Savolainen, P.
    Magnusson, J.
    Gopalakrishnan, M.
    Bekar, Turanoglu E.
    Skoogh, A.
    IFAC PAPERSONLINE, 2020, 53 (03): : 95 - 100
  • [9] Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industry
    Gnoni, MG
    Iavagnilio, R
    Mossa, G
    Mummolo, G
    Di Leva, A
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 85 (02) : 251 - 262
  • [10] The digital factory - Planning and simulation of production in automotive industry
    Arndt, F. Wolfgang
    Informatics in Control, Automation and Robotics I, 2006, : 27 - 29