A robust optimization approach for steeling-continuous casting charge batch planning with uncertain slab weight

被引:1
|
作者
Li, Congxin [1 ]
Sun, Liangliang [1 ,2 ]
机构
[1] Shenyang Jianzhu Univ, Sch Mech Engn, Shenyang 110168, Peoples R China
[2] Northeastern Univ Qinghuangdao, Sch Control Engn, Qinhuangdao 066004, Peoples R China
基金
中国国家自然科学基金;
关键词
Charge batch planning; Robust optimization; Surrogate lagrangian relaxation; Improved objective feasibility pump; 0-1 mixed integer programming; LAGRANGIAN-RELAXATION; STEELMAKING; ALGORITHM; DECOMPOSITION; CONVERGENCE; SEARCH;
D O I
10.1016/j.jprocont.2024.103338
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The volatility of slab weight in steelmaking-continuous casting (SCC) production, attributed to factors such as flexible order demand, is addressed in this paper. A robust optimization mathematical model for charge batch planning (CBP) with uncertain slab weight is established, and a collaborative optimization method using the surrogate Lagrangian relaxation (SLR) framework and improved objective feasibility pump (IOFP) is developed to solve the problem. In the SLR method, new step-size updating conditions are developed, eliminating the need for pre-estimating the optimal dual value. Additionally, only a subset of subproblems that satisfy the optimality conditions of the surrogate needs to be solved to overcome the low optimization efficiency resulting from oscillations in the feasible domain during internal searches in traditional Lagrangian relaxation (LR) methods. The IOFP method is employed to match the structure of the subproblem model of 0-1 mixed integer programming (MIP). During the search for integer solutions, a weighted objective function is added to the auxiliary model to improve the quality of solutions. Furthermore, it combines a variable neighborhood branching method to prevent the algorithm from entering into cycles. Finally, the effectiveness of the proposed model and the performance of the algorithm are validated through simulation experiments.
引用
收藏
页数:16
相关论文
共 15 条
  • [1] AN APPROACH TO ROBUST PROCESS DESIGN FOR CONTINUOUS CASTING OF SLAB
    Shukla, Rishabh
    Goyal, Sharad
    Singh, Amarendra K.
    Panchal, Jitesh H.
    Allen, Janet K.
    Mistree, Farrokh
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2014, VOL 2B, 2014,
  • [2] A Distributionally Robust Scheduling Approach for Uncertain Steelmaking and Continuous Casting Processes
    Niu, Shengsheng
    Song, Shiji
    Chiong, Raymond
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2022, 52 (06): : 3900 - 3914
  • [3] A particle swarm approach for optimization of secondary cooling process in slab continuous casting
    Wang, Xudong
    Wang, Zhaofeng
    Liu, Yu
    Du, Fengming
    Yao, Man
    Zhang, Xiaobing
    INTERNATIONAL JOURNAL OF HEAT AND MASS TRANSFER, 2016, 93 : 250 - 256
  • [4] Robust optimization method for steelmaking-continuous casting scheduling with uncertain processing times
    Yan J.-C.
    Chen H.-Y.
    Zhang W.-X.
    Su Y.-X.
    Li T.-K.
    Wang B.-L.
    Kongzhi yu Juece/Control and Decision, 2023, 38 (06): : 1661 - 1669
  • [5] Hybrid optimization for charge planning problem in twin strands continuous casting production
    Jian Yi
    Shu-jin Jia
    Bin Du
    Journal of Iron and Steel Research International, 2021, 28 : 520 - 529
  • [6] Hybrid optimization for charge planning problem in twin strands continuous casting production
    Yi, Jian
    Jia, Shu-jin
    Du, Bin
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2021, 28 (05) : 520 - 529
  • [7] The Strategic Weight Manipulation Model in Uncertain Environment: A Robust Risk Optimization Approach
    Qu, Shaojian
    Wang, Lun
    Ji, Ying
    Zuo, Lulu
    Wang, Zheng
    SYSTEMS, 2023, 11 (03):
  • [8] Research on Decision Support Method for Charge Batch Planning of Steelmaking-Continuous Casting under Lagrangian Framework
    Sun, Liangliang
    Yu, Yaqian
    Li, Congxin
    Cloete, Duncan Stephen
    Bai, Song
    IFAC PAPERSONLINE, 2020, 53 (02): : 11138 - 11143
  • [9] An integrated production batch planning approach for steelmaking-continuous casting with cast batching plan as the core
    Wang, Yong-Zhou
    Zheng, Zhong
    Zhu, Ming-Mei
    Zhang, Kai -Tian
    Gao, Xiao-Qiang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 173
  • [10] Bi-objective multi-period planning with uncertain weights: a robust optimization approach
    Palma, Cristian D.
    Nelson, John D.
    EUROPEAN JOURNAL OF FOREST RESEARCH, 2010, 129 (06) : 1081 - 1091